My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007821
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 5:41:31 PM
Creation date
7/15/2019 4:35:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007821
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. App, p, Appendix A - Site Background Information <br /> Forn Former Stockton Plating Facility <br /> Page Page 4 of 7 <br /> The control further off-site migration of contaminants toward the east, in the predominantly down- <br /> each gradient direction The results of the pumping tests were reported in the AGE-prepared Ground <br /> inlet Water Extraction Pilot Test Report dated 31 January 2002 <br /> oxid <br /> mon The January 2002 report stated that the soil at the site has a high percentage of fine-grained matrix <br /> difft and overall is homogenous and mostly fine-grained In general this soil type has a high adsorption <br /> was capacity and low permeability, and thereby could potentially limit migration of dissolved <br /> hydrocarbons However,despite the fine-grained nature of the soil,the feasibility test results showed <br /> Sam that groundwater extraction should be effective on the site The groundwater extraction rates during <br /> streE full-scale remediation are not likely to exceed the pilot test extraction rate(five gallons per minute), <br /> mon and may be less for effective ground water extraction and stabilized drawdown <br /> In the report,AGE recommended the use of ground water extraction as an alternative ground water <br /> SVI remediation technique at the site Ground water extraction should provide adequate capture of the <br /> dissolved hydrocarbons, based on site-specific hydrogeologic conditions and hydrocarbon <br /> On distribution The limited areal distribution of high concentrations of dissolved hydrocarbons near the <br /> extr source of the release favors capturing the major portion of the dissolved hydrocarbons on the site <br /> well ,�-n A groundwater extraction system in the source area,along the down-gradient portion of significantly <br /> 2-in lair, impacted ground water, should effectively address the plume of impacted ground water AGE <br /> well recommended preparation of a remedial action work plan for the installation of additional ground <br /> MCI water extraction wells around the former UST area in order to increase 1)the efficiency-of-operation <br /> gall of a ground water extraction treatment system and 2)the effectiveness of the ground water extraction <br /> (sef systems ability to address the dissolved hydrocarbons <br /> inst. <br /> MOT' The AGE-prepared Final Remediation Plan, dated 23 April 2002,recommended the use of ground <br /> and water extraction as an alternative ground water remediation technique at the site, along with soil <br /> of S vapor extraction EHD letter, dated 26 July 2002, issued a denial FRP and requested an additional <br /> Pac cost analysis of remediation technologies <br /> The Ground Water Extraction Clean Up Analysis, dated 31 August 2002,supported the idea that the <br /> SV] limited areal distribution of high concentrations of dissolved hydrocarbons near the source of the <br /> release favors an aggressive approach for removing the dissolved hydrocarbon on-site AGE <br /> They recommended a ground water extraction system in the source area and along the historical down- <br /> ope gradient portion of significantly impacted ground water <br /> Dns <br /> API EHD approval letter of FRP technoloy date 28 May 2003 A Final Remediation Plan Addendum, <br /> dated 18 July 2003, was approved by the EHD on 29 July 2003 <br /> Me <br /> and <br /> Coll' 'to1 SOIL-VAPOR EXTRACTION SYSTEM INSTALLATION <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.