My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007821
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
632
>
3500 - Local Oversight Program
>
PR0505525
>
ARCHIVED REPORTS XR0007821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 5:41:31 PM
Creation date
7/15/2019 4:35:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007821
RECORD_ID
PR0505525
PE
2953
FACILITY_ID
FA0002387
FACILITY_NAME
KEYSTONE AUTOMOTIVE INDUSTRIES INC
STREET_NUMBER
632
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14907033
CURRENT_STATUS
02
SITE_LOCATION
632 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A - Site Background Information <br /> Former Stockton Plating Facility <br /> Page 6 of 7 <br /> the SVE network and to determine the SVE hydrocarbon destruction rate <br /> GROUND WATER EXTRACTION SYSTEM INSTALLATION <br /> Four 1 5-inch diameter, stainless steel QED Environmental model H23SET pneumatic powered, <br /> down-well pumps were installed in vapor extraction wells VW-1, VW-2, VW-3 and VW-4 The <br /> pumps were internally equipped with a one-way check valve to prevent back-flow The pumps were <br /> installed in each well at a depth of approximately 45 feet bsg One-half inch diameter poly-vinyl <br /> chloride (PVC)tubing was routed from each pump to the top of each well casing and through a 2- <br /> inch diameter sanitary well seal In the remediation area, a manifold was created with independent <br /> flow meters and a dedicated sampling port to allow sampling of each well independently without <br /> having to remove each respective well head assembly <br /> On 02 February 2004, a 4-inch diameter, stainless steel model 5 S 8 Grundfos Rediflow down-well <br /> pump equipped with 230 volt 1/2-horsepower 3-wire motors were installed in ground water extraction <br /> well EW-1 The Grundfos pump was Installed in well EW-1 at a depth of approximately 65 feet <br /> below surface grade(bsg) Schedule 40, 1-inch diameter PVC tubing was routed from the pump to <br /> the top of the well casing and through a 4-inch diameter sanitary well seal In the remediation area, <br /> an independent flow meter and a sampling port was Installed to allow sampling of the well without <br /> having to remove the well head assembly <br /> Installation of Ground Water Treatment System <br /> Three 2,000-gallon granular active carbon(GAC)media vessels,one 300-gallon poly tank(holding <br /> tank), one process pump and one sediment filter chamber were installed for the ground water <br /> treatment system <br /> Ground water pumped from the recovery wells is initially routed via the piping system to the 300- <br /> gallon poly tank(holding tank)prior to processing The holding tank is equipped with various water <br /> level float controls to control the rate at which extracted water is introduced into the treatment <br /> vessels, to allow coarser sediment to settle out prior to treatment and to provide safety shutoff <br /> capabilities A high float(high-high)was installed near the top of the holding tank and is designed <br /> to shut the entire system down if water level exceeds the high-high float A middle float (high- <br /> low)was installed near the middle of the holding tank and is designed to turn on the process pump <br /> when water level exceeds the high-low float A low float was installed near the bottom of the holding <br /> tank(low-low) and is designed to turn off the process pump <br /> • A '/2-horsepower, single-phase centrifugal process pump was installed inside the holding tank The <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.