Laserfiche WebLink
H s —ires'e r <br /> a s - k <br /> SOIL REMEDIATION <br /> the above mentioned report concerning <br /> the pilot <br /> As was shown in characoa1 absorbtion will bethe hould <br /> test, vapor extraction using <br /> option for remediating the soil to the QO foot depth, <br /> positive impact on the ground water plume beneath the <br /> also have a g approximately 30% of <br /> site Cameron Yakima state tharocarbonaoflapped charcoal as an <br /> is <br /> absorbtion for gasoline range by <br /> He have found that this o�dsrafihydrocarbons <br /> on rat <br /> the charcoal weight' the above estimate of F weight for the <br /> closer to 25%• and a 25� absorbtion by <br /> to bs removed, 2268 lbs. <br /> D72 lbs. of activated charcoal a needby themonth <br /> charcoal, y, activated charcoal reactor by <br /> Yakima rents a 10,000 lb• this reactor with two 85 <br /> plus profiling. and disposal fees- Using ounds each of activated <br /> d <br /> gallon activated charcoal stub scrubs {30Q p <br /> Ot <br /> charcoal) in series on the 10, <br /> 000 lb. reactors exhaust, <br /> increasing the flow rate from 30 two scfmRotronrienR during <br /> blowersthe in <br /> test, to 100 scfm by placing <br /> • this will also increase theofahyddrrocarobons Pei' tdaye <br /> parallel, roximatlly 200 lbs- 60% of the <br /> should remove app roximately <br /> during the initial week of extThisloconcentration will start to <br /> to be <br /> recoverable hydrocarbons. <br /> in the vapor stream and the two blowers will need <br /> vacuum <br /> decreaseslowing the €law rate but increasing This <br /> hooked in series, or extraction on the soil-drops to <br /> rating for the duration of vwP recovery <br /> will take place when the daily <br /> replumbing ounds per day. <br /> approximately 75 p <br /> VAPOR EBTRACTION SYSTEM CONSTRUCTION <br /> l should Rotron Blowers in paralleincrease by th2to <br /> DR 505 AX <br /> Using two increasing pounds recovered by <br /> flow rate by 2.5 to 3 times <br /> and increasing the vacuum that can be d onto <br /> exerted <br /> 2.5 times) the <br /> ti <br /> formation by 1.75 to 2 times. water <br /> Pl. P3 and 'ground DR 505 ASC <br /> Manifold vapor extraction MW5 tostworexplo' we proof, <br /> monitoring wells MW'1 arallel. At each well head a air tight <br /> Rotron Blowers hooked in P art sleeve to <br /> man Tee will be placed with a needle valve l control the <br /> m „ �} on the well, and a orifice sample p this <br /> influence vacuum temperatures and flow iotas at the W <br /> placed onla common „ <br /> measure vapors, can also be g <br /> le ort, valve assembly <br /> with individual tubi-ng r' 5 to <br /> orifice camp P <br /> manifold at the treatment comp <br /> the wells). MW,,, <br /> MW2, MW3 r �'• 811d M4�T6 will be used <br /> _ le-_port co measure, vapors and <br /> ---- -------- ----Gra••usd._water monitoring A same also _-- <br /> .a s. These--wells-wells -- ---- - ----- <br /> as vacuum influencinwplace on the well P . enhance the " <br /> vacuum is already action wells to help . <br /> 4 be converted into hot air injection <br /> page 4 <br /> . 4 <br />