My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008208
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1448
>
3500 - Local Oversight Program
>
PR0544673
>
ARCHIVED REPORTS XR0008208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 4:26:49 AM
Creation date
7/18/2019 3:50:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008208
RECORD_ID
PR0544673
PE
3528
FACILITY_ID
FA0006182
FACILITY_NAME
REGAL STATION #604
STREET_NUMBER
1448
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
1448 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and safety officer who will log the borings and take vapor <br /> t readings with a hand held photoionizing detector (PID) , see Figure <br /> 8 for boring/sample locations. <br /> The sampling of the borings Within the excavation will commence at <br /> the 20 foot depth and samples will be obtained in 5 foot intervals <br /> to the 35 foot depth. In order to safely perform the boring and <br /> sampling the driller will stand at the surface of the excavation <br /> only in areas that inspections indicate are stable. The driller <br /> will be secured, using a safety harness, to an immobile object <br /> (island canopy support or bumper of the service truck) similarly <br /> to the drilling safety methods. The hand auger/sampled boring <br /> will be drilled at an angle that will prevent the driller from <br /> leaning out over the excavation. This angle will be measured with <br /> a brunton to correct the angled hole to vertical depth. <br /> To economically determine the vertical extent of petroleum <br /> contamination associated with the product lines, a 4" diameter <br /> hand auger with sampler and driver will be utilized, see figure 8. <br /> The holes will be hand augered in five foot intervals, the auger <br /> there will be withdrawn and a sampler containing one VOx6'° sterile <br /> braes sleeve will be placed at the base of the hole and hand <br /> driven to obtain a sleeved sample for certified laboratory <br /> analysis. This procedure will be accomplished from outside the <br /> excavation, as outlined above. <br /> The sampling of the borings within the product line trenches will <br /> commence at the 10 foot depth and samples will be obtained in 5 <br /> foot intervals until screening with the PID indicates that the <br /> soil is clean. <br /> DESTROYING THE BORINGS <br /> The sample borings produced in the product line trenches will be <br /> backfilled with neat cement by pouring from the surface. The <br /> exploratory borings produced by Hogate Drilling showed that the <br /> soil has enough clay and silt for the holes to stay open. <br /> The sample borings produced in the excavation will be part of the <br /> over excavation process and will be left open, not be backfilled. <br /> Again let as assure you that ..a "=`" not qo into the excavation, <br /> we will perform our borings from the ourface with extensions that <br /> will enable us to reach the excavation surface and perform the <br /> sampling. Also this investigation will Le performed with a two <br /> person team; one doing the actual boring the other is the safety <br /> officer who will also log the bo-:i g and take vapor readings with <br /> a hand held photoionizing detector (PID) . <br /> EBCAVATED BOIL AND RINSATE HANDLING <br /> All soil produced from the hand angered borings will be Placed <br /> with the SP1-A excavated soil pile and covered with a polyethylene <br /> liner. <br /> .� 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.