Laserfiche WebLink
Table 1 u <br /> Soil Boring and Well Construction Details <br /> 7-Eleven Store#19976 <br /> 1399 North Main Street <br /> Manteca, California <br /> Total Well Screen Screen <br /> Well Drill Depth Diameter Top Bottom Length Comments <br /> I.D. Date (feet bgs) (inches) (feet bgs) (feet bgs) (feet) <br /> Soil Barings <br /> -1 04/29/9 40 2 -- -- __ <br /> GP-2 0 /98 46 2 -- -- -- <br /> GP-3 04 9/98 47 2 -- -- -- <br /> S -1 05/11/99-,, 66 7 -- -- -- <br /> S13-2 11/01/00 1 45 1 6 1 -- -- -- <br /> Monitoring Wells <br /> MW-1 09/02/98 2 10 30 20 ual-nested well <br /> MW-1A 51 2 45 50 5 `R' � <br /> 7 MW-2 09/03/98 31.5 2 10 30 20 OcCqMPowngradientwell <br /> J� MW-3 09/03/98 31.5 2 10 30 20 <br /> MW-4 05/17/99 30 2 10 30 20 Off-site monitor well <br /> MW-4A 05/17/99 53 2 45 50 5 Off-site monitor well <br /> MW-5 05/12/99 30 2 10 30 20 <br /> MW-5 05/11/99 51 2 45 50 5 d0fA kw' <br /> 7^4D MW-6 12/22/99 30 2 10 30 20 <br /> T// MW-7 11/01/00 31 2 15 30 15 c -5� <br /> ?-� MW-8 11/29/06 35 2 13 33 20 <br /> Remediation Wells <br /> Jay SPA 10/29/01 & 2 30 35 5 Dual-nested sparge well <br /> SP-1A 10/30/01 50 2 45 50 5 ovbtoet.il- <br /> SP-2 11/29/06 40 IZ / 35 38 3 02 Injection Well <br /> 7� SP-3 40 2 35 38 3 OZ Injection Well <br /> Soil Gas Probes and Borings <br /> SG-1 1 09/18/003 -- -- -- -- Temporary Vapor Point <br /> G-2 09/18/00 3 -- -- -- -- Temporary Vapor Point <br /> S -3 09/18/00 3 -- -- -- -- Temporary Vapor Point <br /> SG- 09/18/ 3 -- -- -- -- Temporary Vapor Point <br /> SG-5 091,4100 3 -- -- -- -- Temporary Vapor Point <br /> SG-6 /18/00 3 -- -- -- -- Temporary Vapor Point <br /> SG-7 "ON/18/00 3 -- -- -- -- Temporary Vapor Point <br /> SG-y 09 18/00 3 -- -- -- -- Temporary Vapor Point <br /> SX-9 09/ /00 3 -- -- -- -- Temporary Vapor Point <br /> G-10 09/18/bQ 3 -- -- -- -- Temporary Vapor Point <br /> 78SG-11 09/18/00 3 -- -- -- -- Temporary Vapor Point <br /> -SG-12 05/09/11 5 -- -- -- 2 in. Soil Gas Probe <br /> ,729-1 SG-13 05/09/11 5 -- -- -- 2 in. Soil Gas Probe <br /> 7-10 SG-14 05/09/11 5 -- -- -- 2 in. Soil Gas Probe <br /> 7-9' SGA5 05/09/11 5 -- -- -- 2 in. Soil Gas Probe <br /> 7�8 SG-16 05/09/11 5 -- -- -- 2 in. Soil Gas Probe <br /> Explanation <br /> Wells are of poly-vinyl-chloride(PVC)construction <br /> bgs=Below ground surface <br /> On September 18,2000,as requested by the SJCPHS,eleven soil-gas survey points were pushed to 3 feet bg. <br /> 19976 Current Well Boring Sum.xlsx Page 1 of 1 <br />