Laserfiche WebLink
? _ IL _. .. <br /> N%Woo/ <br /> San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> -=•�J Donna Heran,REHS <br /> z. 1868 East Hazelton Avenue <br /> Stockton, California 95205-6232 PROGRAM COORDINATORS <br /> . Robert McClellon,REHS <br /> ` Jeff Carruesco,REHS,RDI <br /> c .• p <br /> q��Fo.Ra\ Website: www.sjgov.org/ehd Kasey Foley,REHS <br /> Linda Turk tte,RENS <br /> Phone:zz(209)468-3420 <br /> F Apri101gg� ,426s01438 <br /> Mr. Jose Rios <br /> 7-Eleven, Incorporated <br /> Post Office Sox 711 <br /> Dallas, Texas 75221-0711 <br /> Subject: 7-Eleven Store No. 19976 <br /> 1399 North Main Street <br /> Manteca, California 95336 <br /> The San Joaquin County Environmental Health Department (EHD) has received and reviewed <br /> Work Plan for Well Destruction (work plan), dated 18 February 2014, prepared and submitted by <br /> your consulting firm, Stantec Consulting Services Inc. (Stantec), on your behalf for the above- <br /> referenced site. The work plan was submitted in response to the EHD letter dated 24 <br /> December 2013 directing a well destruction work plan be submitted to this agency. <br /> In the work plan, Stantec proposes to destroy monitoring well MW-2 and nested wells <br /> MW-1/MW-1A and SP-1/SP-1A by over-drilling; soil gas probes SG-12 through SG16 by hand <br /> tools and air-knife/vacuum equipment; and MW-3, MW-4, MW-4A, MW-5, MW-5A, MW-7, <br /> MW-8, SP-2 and SP-3 by pressure grouting. Stantec proposes to capture groundwater <br /> displaced to the surface for disposal "or depending on the quantity, it (displaced groundwater) <br /> may be used to mix additional grout". Stantec proposes to apply approximately fifteen pounds <br /> per square inch (psi) of pressure to the cement grout for a period of five minutes during the <br /> pressure grouting process followed by removing the well box and the top three to five feet of <br /> well seal and casing. <br /> The EHD approves the work plan with the following conditions: <br /> • Over-drill MW-5A instead of pressure grouting this well since contaminants of concern <br /> were detected in soil samples collected at thirty feet below surface grade (bsg) during <br /> the well installation; based on the remote location of MW-5A, soil in this area may not <br /> have benefitted from remediation performed at this site; <br /> Pressure grout MW-6; this well was inadvertently omitted from the well destruction list; <br /> When destroying wells by pressure grouting, remove only the top three feet (not five <br /> feet) of well seal,and"soil; it is difficult to cut the casing at depths greater than two-and- <br /> a-half feet prior to inserting the grout; <br /> • Use only potable water to make the grout; displaced groundwater may not be used to <br /> make grout or for any other purpose and must be disposed of properly; <br /> • Apply at least 25 psi of liquid grout pressure for ten minutes when pressure gr uting the <br /> wells; destroy the wells by over-drilling if the well casings are unable to withsta this <br /> pressure for this length of time; <br /> RECEIVED APR 2 21014 <br />