My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012683
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
ARCHIVED REPORTS XR0012683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:02:15 AM
Creation date
7/24/2019 8:17:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012683
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ma <br /> µ'M <br /> sy <br /> ADOQMUM 70 9)-TANK WE ASSM A DfT Y10FOG'LAN," <br /> 7 March 1991 <br /> Page 3 <br /> o In order to address the impacted soils below the proposed tank <br /> � basin, the installation of two 12 inch Schedule 80 PVC sumps <br /> a will be installed, during construction, within the new tank <br /> basin as shown on Figure 1 and Figure 2; <br /> o One 12 inch sump will be located in the known impacted area <br /> ' along the north side and between two of the proposed tanks. <br /> The remaining 12 inch sump will be located in the southern <br /> half of the new UST'sFi <br /> ( gore 2) ; <br /> a Access to the sumps will be through a traffic box set flush <br /> with the new concrete pad. Upon completion of the UST <br /> installation, two vapor extraction wells will be constructed <br /> ` g within the sumps according to Exxon's and SJCPHSD's <br /> F„l requirements. The vapor extraction well depths, construction <br /> will be determined in future workplans; <br /> o A 30 mil Oil Resistant PVC plastic tarp, lining the new tank <br /> basin, will act as a vapor barrier between the porous tank <br /> .,, basin backfill material and the native soils (Figure 2) . This <br /> will allow for vapor flow to occur mainly in the native soils <br /> below the proposed tank basin; <br /> `" a The Typar Filter Fabric will protect the plastic tarp from <br /> tear that could occur during backfilling and.installation of <br /> the new UST's (Figure 2) ; <br /> The manage`nent of the stockpiled soil generated during removal of <br /> + the existing UST's and extended excavation for the proposed UST's <br /> is as fol,'.ows: <br /> o During excavation the soil will be segregated by utilization <br /> of a field screening device. The soil will be temporarily <br /> stockpiled on site and placed on and covered with plastic. <br /> The volume of soil is suspected to be approximately 650 cubic " <br /> ! ` yards; <br /> o Based upon field readings, the soil will be sampled according <br /> to the San Joaquin County Air Pollution Control District. The <br /> samples will be sent, under chain-of-custody, to a state- <br /> certified laboratory for the specified analyses; and, <br /> oUpon receipt of the._.labo.r.atory__.re..sults__r4port.,_the._soil_will— <br /> -- be treated accordingly and disposed of at an Exxon approved <br /> landfill. <br /> 9o-2=,LTR <br />
The URL can be used to link to this page
Your browser does not support the video tag.