My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012683
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
ARCHIVED REPORTS XR0012683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:02:15 AM
Creation date
7/24/2019 8:17:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012683
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - - - --•-�: ,� ..,� max. <br /> u. <br /> ADDENDUM TO"Ff1ETAHKYfEASSMSMFIff WOF07L ' <br /> (Ae9KJWL-Y 1941} <br /> 7 March 1941 <br /> Pape 4 <br /> - REPORTING <br /> A Results Report will be prepared after completion of the tank <br /> removal and replacement summarizing field activity and analytical <br /> results acquired during site construction. The report will be <br /> factual in nature. Further work, as necessary, will be addressed <br /> in subsequent workplans. <br /> r <br /> SCHEDULING <br /> Aegis will proceed with the work outlined in this plan upon <br /> approval by the governing agency. The tank replacement is <br /> scheduled to begin on Monday, 18 March 1991. A report of our <br /> results during the tank removal and new tank installation could be <br /> prepared within three weeks after laboratory results are received. <br /> SUMKARX <br /> r# <br /> The objective of the proposed work outlined in the "addendum" is to <br /> allow for surface access to the impacted soil below the existing <br /> and proposed UST's. After completion of site construction, two <br /> vapor extraction wells will be installed within the sumps to assist <br /> in remediating the impacted native soils below the new UST. <br /> Furthermore, stockpiled soil generated during the tank removal and <br /> installation will be addressed according to recommendations of the <br /> San Joaquin County Air Pollution Control District. The required <br /> soil sample collection during the tank removal will be in <br /> !� accordance with the San Joaquin County Public Health Services <br /> Department, the Tri-Regional Staff Recommendations for Initial <br /> Evaluation and the Leaking Underground Fuel Tank (LOFT) Manual. <br /> �- PROJECT CONTACTS/REPRESENTATIVES <br /> Mr. William Y. Wang, Construction & Maintenance Engineer <br /> Exxon Company, Q.S.A. <br /> 2100 Clayton Road, Suite 1250 <br /> Concord, California 94524-2032 <br /> (415) 246-8752 <br /> Mrs. Jacqueline R. Doub, Project Engineer, or, <br /> Mr. Robert E. Kimmerling, project Engineer <br /> Aegis Environmental, Inc. <br /> 801 Riverside Avenue, Suite C <br /> -�_:—.-- =—=------ -------------Rasevil-lei CA---95678---------------------- -- - --- ------------------ <br /> (961) 782-2110 <br /> W205C.LTR <br />
The URL can be used to link to this page
Your browser does not support the video tag.