Laserfiche WebLink
SWRCB, January 2002 <br />ord-r%XT„ A nv DTDL r QTYNC- <br />Page _ of <br />�. l7 L' 111/1\LAl\ 1 1 u <br />Test Method Developed By: ❑ Piping Manufacturer E Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used g Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure Gauge Equipment Resolution: 0 Change In <br />91 Product Line to 91 Product Line to Red Diesel Product Red Diesel Product <br />Transition Dis ensers Line to Transition Line to Dispensers <br />Fiberglass <br />Ameron <br />Plastic <br />Fiberglass <br />Plastic <br />Piping Material: <br />Piping Manufacturer: <br />XP <br />Ameron <br />xi' <br />2 inches <br />2 inches <br />2 inches <br />2 inches <br />Piping Diameter: <br />70 feet <br />15 feet <br />70 feet <br />15 feet <br />Length of Piping Run: <br />91 octane <br />91 octane <br />Red Diesel <br />Red Diesel <br />Product Stored: <br />Reducer boot with <br />Sealed off reducer <br />Reducer boot with <br />Sealed off reducer <br />Method and location of <br />Schrader valve in <br />boot after pipe <br />Schrader valve in <br />boot after pipe <br />piping -run isolation: <br />transition sum <br />daylights <br />transition sump <br />da li hts <br />Wait time between applying <br />10 min. <br />10 min. <br />10 min. <br />pressure/vacuum/water and <br />10 min. <br />starting test: <br />Test Start Time: <br />10:00 <br />10:10 <br />12:00 <br />Initial Reading (RO: <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />5.0 p si <br />5.0 p <br />Test End Time: <br />11:00 <br />11:10 <br />1:00 <br />1:00 <br />Final Reading (RF): <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />Test Duration: <br />1 hour <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (RF -R,): <br />0 psi <br />0 psi <br />0 psi <br />0 psi <br />Pass/Fail Threshold or <br />0 psi change <br />0 psi change <br />0 psi change <br />0 psi change <br />Criteria: <br />Test Result: <br />®Pass ❑Fail <br />E Pass ❑ Fail <br />® Pass 11Fail <br />® Pass ❑ Fail <br />Comments (include information on repairs made prior to testing and recommendedfollow-upforfailed tests) <br />C-% r— 1-1 r a T& I I- I -x <br />Hj=&ITN <br />