Laserfiche WebLink
G0010gcc11 trechnics l�tc. <br /> 1101 7'h street <br /> Modesto,California 95354 <br /> (209)522-41 19/Fax#522-4227 ENVIRONMENT HEALTH <br /> pERM1T�SERVICES - <br /> January 21, 2003 <br /> Project No.: 723.2 <br /> Project Name: Valentine (El Dorado St.) <br /> Ms. Linda Sanborn <br /> State Water Resources Control Board <br /> 2014 T Street, Suite 130 <br /> P.O. Box 944212 <br /> Sacramento, CA 94244-2120 <br /> RE: Cost Pre-Approval: Site Characterization Work Plan <br /> Location: 2315 N. El Dorado St., Stockton, CA <br /> County Site Code: 9401; USTCFP Claim #0417 <br /> i <br /> Dear Ms. Sanborn: <br /> On November 30, 2001, Geological Technics Inc. (GTI) submitted an Additional Site <br /> Characterization Report that documented the installation of a deep, discretely screened i <br /> monitoring well at the above site. Analytical data shows the presence of gasoline range <br /> petroleum hydrocarbons in the soil and groundwater to a depth of at least 150 feet bgs. <br /> In a letter dated April 29, 2002, Mr. Jeff Wong of SJC PHS/EHD issued a letter directing that a <br /> work plan for the investigation of the lateral and vertical definition of the plume be submitted <br /> by July 1, 2002. GTI submitted a "Additional Site Characterization Work Plan" dated June 27, <br /> 2002 to SJC PHS/EHD. The work plan included provisions for installing one additional on site <br /> deep screened well, and three off site well clusters consisting of a shallow, intermediate and <br /> deep well at each location. In their October 22, 2002 correspondence, SJC PHS/EHD approved <br /> the GTI work plan with modifications: the deep screened well and the off site well clusters were <br /> disapproved. Instead, SJC PHS/EHD required that continuous multi-chambered tubing <br /> (CMTTM) wells be used instead of discretely screened, multiple PVC wells. In addition, SJC <br /> PHS/EHD also required that the first boring be continuously sampled to determine off site- <br /> lithology. <br /> In our October 29, 2002 work plan addendum, GTI acknowledged the changes mandated by <br /> SJC PHS/EHD. <br /> Proposed Direction of Project <br /> This opinion of cost includes the following work: <br /> • Drill three deep boreholes to a maximum depth of 100 feet. <br /> • Obtain 3 soil samples from each borehole for laboratory analysis. <br /> • Construct and install one continuous multi-chamber tubing (CMTTM) monitoring well with <br /> three screened intervals in each borehole. <br /> • Prepare and submit report on the installation of the CMTTM wells. <br /> • Perform one year(four consecutive quarters) of groundwater monitoring-seventeen wells. <br /> • Prepare and submit reports for the quarterly monitoring reports. <br /> i <br /> i <br />