Laserfiche WebLink
GeofogicafTechnics inc. Page 2 <br /> Valentine(Castle Motors) <br /> Additional Site Characterization <br /> Project No.: 723.2 <br /> January 21,2003 <br /> Proposed Bidding of Project <br /> To remain in compliance with the USTCFP, GTI requested various vendors to prepare bids. <br /> GTI requested bids from V&W Drilling to prepare for drilling, constructing and installing the <br /> CMTTM wells and Del-Tech for well development & sampling services. We have found these <br /> companies to be very cost effective for three primary reasons: <br /> • reasonable charge rate <br /> • fast drilling equipment <br /> • well trained crews <br /> A single source bid was obtained from Solinst Canada Ltd. for the CMTTM well materials and <br /> installation equipment. <br /> The following supporting documents are attached: <br /> ■ Work Plan <br /> ■ SJCPHS-EHD correspondence that describes the required work <br /> ■ Bids ` <br /> ■ Itemized spreadsheet of costs for performing this work <br /> Tentative Schedule for Implementing Work ` <br /> The proposed schedule for the additional site characterization work and 'groundwater <br /> monitoring is as follows: <br /> Task Description Completion Data E <br /> • Submit Bids/Cost pre-approval to the Fund January 2003 <br /> • Receive Cost approval from the Fund February 2003 <br /> • Install the CMTTM wells April 2003 <br /> • Submit well installation report June 2003 <br /> • Perform quarterly monitoring events: July, October 2003 & January, April 2004. <br /> Thank you for your attention to this project. Call me if you have questions or need <br /> clarification. My phone number is (209) 522-4119. <br /> i <br /> Respectfully Submitted, <br /> U <br /> Raynold I. Kablanow II, Ph.D. <br /> cc: Steve Valentine—Valentine(El Dorado) , <br /> Marty Hartzell —CRWQCB-CVR <br /> Jeffrey Wong— SJCPHS-EHD <br /> i <br /> t <br />