My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 4:35:43 PM
Creation date
7/24/2019 4:28:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0542208
PE
2960
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Water Resources Control Board <br /> Division of Clean Water Programs <br /> H. - 2014 T Street • Sacramento, California 95814 • (916) 227-0747 <br /> Winston Hlckox - <br /> Ston H,y for Mailing Address: P.O. Box 944212 • Sacramento, California • 94244-2120 ,' k' It Gray Davis <br /> Environmental FAX (916) 227-4530 • Internet Address: http://www.swrcb.ca.gov/— wphome/mtcf novernor <br /> Protection ` <br /> July 26, 2000 <br /> Allen Genetti <br /> P. O. Box 6245 <br /> Stockton, CA 95206 <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 00848% <br /> SITE ADDRESS : 3105 S. ELDORADO STREET, STOCKTON, CA <br /> I have reviewed your request, received on July 14, 2000, for pre-approval of corrective action costs. The <br /> total cost pre-approved as eligible for reimbursement for completing the May 1 , 2000 workplan and <br /> May 11 , 2000 workplan addendum approved by San Joaquin County EHD (County) is $10,144. Please <br /> note that four quarters of groundwater monitoring and sampling was not ore-unmoved at this time <br /> because no cost estimate was submitted for this task. <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable and <br /> necessary corrective action costs for work directed and approved by the San Joaquin County EHD will <br /> be eligible for reimbursement per the terms of your Letter of Commitment at costs consistent with those <br /> pre-approved in this letter. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval before <br /> you will be reimbursed. Please insure that your consultantprepares their invoices to include the <br /> required breakdown of costs on a time and materials basis, that invoiced tasks are consistent with the <br /> original proposal, and that reasonable explanations are provided for any changes made in the scope of <br /> work or increases in the costs. When the invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions; I can be reached at (916) 227-0747. <br /> Sincerely, ? 9 <br /> Linda Sanborn, Associate Governmental Program Analyst <br /> Technical Review Unit, UST Cleanup Fund <br /> cc: CarolOZ�/ <br /> San Joaquin County EHD <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> CaUfornia Lo Pironmenta/Protection Agency <br /> �t>• Recyc/edFdper <br />
The URL can be used to link to this page
Your browser does not support the video tag.