My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 4:35:43 PM
Creation date
7/24/2019 4:28:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0542208
PE
2960
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> California Tank Lines, Inc , -2- November 29, 1999 <br />!I <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs on the <br /> new scope of work. <br /> • Although I have referred to the Environeering, Inc., V & W Drilling, Inc., Ramage Environmental, <br /> Precision Environ-Tech, and Kier & Wright Civil Engineers & Surveyors proposals in my pre- <br /> approval above, please be aware that you will be entering into a private contract: the State of <br /> California cannot compel you to sign any specific contract. This letter pre-approves the costs as <br /> presented in the proposal for conducting the work approved by the County for implementing the <br /> January 28, 1999 Environeering, Inc. workplan. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, or a bid <br /> waiver from Fund staff, from qualified firms for all necessary corrective action work. The legislation <br /> governing the Fund requires that the Fund assist you in procuring contractor and consultant services for <br /> corrective action. If you need assistance in contracting for corrective action services, don 't hesitate to call <br /> me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval before <br /> you will be reimbursed. Please insure that your consultant prepares their invoices to include the <br /> required break down of costs on a time and materials basis, that invoiced tasks are consistent with the <br /> original proposal, and that reasonable explanations are provided for any changes Hanle in the scope of <br /> work or increases in the costs. When the invoices are submitted you must include copies ofall., <br /> •, subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions; I can be reached at (916) 2274518 . <br /> Sincerely, <br /> WeRnilyn F9, Water Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> cc: Ms. Margaret Lagorio <br /> San Joaquin County E14D <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> California Environmental Protection Agencv <br /> �d Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.