My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 4:35:47 PM
Creation date
7/24/2019 4:30:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542208
PE
2960
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EEIVED <br /> SEP 2 7 1006 <br /> 6.0 RECOMMENDATIONS ENVIRONMENT HEAUH <br /> PERMR/SERVICES <br /> This investigation will be conducted outside the terminal at 3105 S . El Dorado Street, on the <br /> sidewalk and the east side of S . El Dorado Street, making security more difficult. In addition, we <br /> are not proposing to install any new groundwater wells at this time, but only to secure soil and <br />{ groundwater samples from selected areas. A Geoprobe, or push drill, appears to be the ideal <br /> system to complete the necessary investigation with minimal surface and subsurface disturbance. <br /> J In addition, no cuttings are produced during the sampling process. <br /> Three probes (P1 , P2 & P3) will be advanced, one north of MW-4, one south of MW4 (along <br /> the sidewalk), and one east of MW-4 (on the east side of S . El Dorado Street). The approximate <br /> locations of these borings are shown in Figure 3 . Overhead electrical lines, and possible <br /> underground utilities, along South EI Dorado Street, will influence the exact location of these <br /> probes. This will be determined by the Department of Health field representative, the geologist, <br /> EI and/or CTL representative, and the operator of the Geoprobe, prior to advancing each probe. <br /> For the scope of this work, the investigation will continue to a depth of 50 feet until two (2) <br /> consecutive samples do not show contamination by field measurd' . with soil sampling at 5 foot <br /> intervals starting at 15 feet below grade. A minimum of four (4) samples will be selected for <br /> analysis for TPHg, TPHd, TPHo, BTEX and MTBE, at least two (2) of which will be from the <br /> saturated zone. In addition, a groundwater samtile will be secured for analysis for TPHg, TPHd, <br /> TPHo, BTEX and MTBE/oxygenates. _ — \\\`l ri c�� 1 ° t 1 <br /> Groundwater samples will be obtained in a cleaned special bailer, secured in 40 ml volatile <br /> organic analysis vials, placed in a cooler with wet ice and delivered to a State certified laboratory <br /> with chain of custody documents. <br /> Probes P1 , P2 & P3 will be back filled with cement grout applied by standard procedures used by <br /> experienced drilling 'contractors. A registered geologist will supervise all operations, and will <br /> log all borings in accordance with the Unified Soil Classification System (USCS). <br /> 7 .0 LABORATORY ANALYSIS <br /> All soil samples will be extracted using EPA method 5030. After extraction, the soil and water <br /> samples will be analyzed for total petroleum hydrocarbons as diesel, oil and gasoline (TPHg, <br />!i <br /> 6 <br /> II <br /> i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.