Laserfiche WebLink
Page 6 of 9 <br /> Now, %moo <br /> groundwater elevation measurements. <br /> 8)Nuel indicated that preparing a <br /> Corrective Action Plan is the preferred <br /> approach for implementing a remedial <br /> action at the Site. This CAP should be <br /> prepared after the 3 new wells are <br /> installed and more information is <br /> obtained about the extent of the product <br /> plume and the product cleanup needs. <br /> The SJCEHD indicated that remediation <br /> will be required based on the product <br /> found in MW2 and based on concurrence <br /> in the recent S WRCB case review. DES <br /> asked if a fixed-base Dual-Phase <br /> Extraction(DPE) System similar to the <br /> System in operation at the adjacent <br /> Pacific Pride Site would be <br /> an appropriate approach. The SJCEHD <br /> indicated that use of such an approach <br /> could be further developed in the CAP. <br /> 9) DES asked about the permitting <br /> process for repairing damaged wellheads. <br /> The SJCEHD indicated that a permit <br /> application needs to be processed for <br /> wellhead repairs and an inspection will <br /> be required. Johnny Yokum manages the <br /> permits at SJCEHD. Vicki will provide <br /> contact information for Johnny Yokum <br /> and the associated permit forms for well <br /> installation and for well repair. <br /> Thanks again for your help in moving <br /> this Case forward. If you have any <br /> questions or concerns, please feel free to <br /> contact Andy or me at 760-639-3600. <br /> Respectfully, <br /> Greg Delson, PG <br /> DONAN ENVIRONMENTAL <br /> SERVICES, INC. <br /> ph: 760-639-3600 <br /> fax: 760-639-3603 <br /> email: gdgDESx z <br /> Begin forwarded message: <br /> From: AD <br /> <a_d(a)_desxyz.com> <br /> 11/10/2014 <br />