My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 4:43:05 PM
Creation date
7/24/2019 4:34:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0542208
PE
2960
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 8 <br /> AGE to perform coordinated monitoring of the <br /> California Tank Lines Site and Pacific Pride <br /> Site on the same day in Q4 2014. Once a date is <br /> scheduled, DES will notify Vicki so that an <br /> inspection can be arranged. <br /> 7) The SJCEHD indicated that conducting an <br /> updated land survey of the Pacific Pride Site <br /> wells would not be productive since those wells <br /> are CMT wells may not provide representative <br /> groundwater elevation measurements. <br /> 8)Nuel indicated that preparing a Corrective <br /> Action Plan is the preferred approach for <br /> implementing a remedial action at the Site. This <br /> CAP should be prepared after the 3 new wells <br /> are installed and more information is obtained <br /> about the extent of the product plume and the <br /> product cleanup needs. The SJCEHD indicated <br /> that remediation will be required based on the <br /> product found in MW2 and based on <br /> concurrence in the recent SWRCB case review. <br /> DES asked if a fixed-base Dual-Phase <br /> Extraction(DPE) System similar to the System <br /> in operation at the adjacent Pacific Pride Site <br /> would be an appropriate approach. The <br /> SJCEHD indicated that use of such an approach <br /> could be further developed in the CAP. <br /> 9) DES asked about the permitting process for <br /> repairing damaged wellheads. The SJCEHD <br /> indicated that a permit application needs to be <br /> processed for wellhead repairs and an <br /> inspection will be required. Johnny Yokum <br /> manages the permits at SJCEHD. Vicki will <br /> provide contact information for Johnny Yokum <br /> and the associated permit forms for well <br /> installation and for well repair. <br /> Thanks again for your help in moving this Case <br /> forward. If you have any questions or <br /> concerns, please feel free to contact Andy or <br /> me at 760-639-3600. <br /> Respectfully, <br /> Greg Delson, PG <br /> DONAN ENVIRONMENTAL SERVICES, <br /> INC. <br /> ph: 760-639-3600 <br /> fax: 760-639-3603 <br /> 11/3/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.