My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 4:43:05 PM
Creation date
7/24/2019 4:34:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0542208
PE
2960
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 8 <br /> ,,s <br /> email: gd&DESxyz.com <br /> Begin forwarded message: <br /> From: AD <br /> <ad@desxyz.com> <br /> Date: September 7, 2014 <br /> 5:49:36 PM PDT <br /> To: Greg <br /> <g DESxyz.com> <br /> Subject: Caltank Mtg <br /> Agenda <br /> Greg, <br /> Proposed Agenda is to summarize <br /> the key points of Q 1-2014 Report <br /> with the San Joaquin County EHD <br /> (Vicki and Nuel) such for feedback <br /> and concurrence on the <br /> investigation concept and moving <br /> forward to a cleanup strategy. <br /> 1) The Q 1-2014 Report updated <br /> the Site's groundwater enigma(Fig <br /> 3)by using the combined <br /> groundwater data(Fig 4) with the <br /> adjacent site <br /> for a combined flow over a wider <br /> area with more wells (Fig 5). <br /> 2) The updated Groundwater plan <br /> then enabled a reference basis with <br /> the Adjacent Site to narrow the <br /> previously historical wide variation <br /> in the Site's groundwater to a more <br /> typical seasonal hydraulic cycle <br /> and consistent with the Adjacent <br /> Site's groundwater flow. (Fig 5 to <br /> Fig 11). The most recent <br /> groundwater plan(Fig 5- Q 1-2014) <br /> shows an added dynamic due to the <br /> Adjacent Site's dewatering. <br /> 3) Co-GW monitoring was <br /> recommended and accepted for the <br /> more accurate mutual benefit of <br /> both Site parties and our common <br /> Agency leadership. <br /> 4Q-2014 is the start of the co- <br /> 11/3/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.