Laserfiche WebLink
HEALTH AND SAFETY PLAN <br /> Village West Marina <br /> The site location for the proposed job of removing one (1) X0, 000 <br /> gallon uZTtL-aded fuel tank, ( 1) 10 , 000 gallon regular fuel tank <br /> and (1) 5Q�000 gallon diesel tank is as follows : <br /> ►'`rbLA <br /> Village West Marina <br /> 6649 Embarcadero <br /> Stockton, CA 95209 <br /> The project manager and the Health and Safety coordinator will be <br /> Wesley DuBose of Western Meter Service, Inc. , 2735 `Teepee Drive , <br /> Suite E, Stockton, CA 95205, (209) 948-6124 . The site safety <br /> officer at the job site will be Wesley DuBose and the alternate <br /> site safety officer will be John Swets , both of Western deter <br /> Service , Inc. <br /> Western Meter Service, Inc. , will have on the site one ( i) fire <br /> extinguisher and (i) first-aid kit within fifty (50) feet of the <br /> tank or areas where flammable vapors are present. <br /> Western Meter Service , Inc . shall notify the local fire <br /> department 48 hours before excavation shall begin. USA will also <br /> be notified before excavation of job. <br /> The tank must be empty of product before start of job. <br /> Western deter Service , Inc. , will triple rinse the tank with soap <br /> and water. Rinse will be pumped from the tank and hauled away by <br /> Refineries Service, Inc. , Patterson, CA 95363, (209) 892-6742 , a <br /> waste hazardous hauler, for disposal . <br /> The tank will be dry iced , 30 pounds of dry ice per 1 , 000 <br /> gallons , before excavating. Western deter Service shall monitor <br /> tank with a Combustible Gas Indicator (CGI) and seal all openings <br /> before tank will be transported. At no time will Western Meter <br /> Service cut or weld on the tank. <br /> The tank will be secured on the truck after extraction for <br /> transportation. the tank and plumbing will be hauled by Redfearn <br /> Trucking, E . Mariposa Road, Stockton , CA, to Triangle Inc_ . of <br /> Sacramento, 3525 52nd Avenue , Sacramento, CA 95823 , to be <br /> destroyed. All of the above procedures will be done according to <br /> code. <br /> Western Meter Service will approach all tank excavation with <br /> possible cave-ins . The following rules will be followed to <br /> prevent any mishaps : 1) soil to be inspected for stability <br /> before and after tank is removed , 2) soil is to be kept at <br /> least two (2) feet from the edge of an excavation, <br />