Laserfiche WebLink
Mr. Atwater -2- June 12, 2001 <br /> ♦ The number of hours to be utilized by each staff/worker <br /> ♦ Subcontractor costs <br /> ♦ Equipment costs <br /> ♦ Itemized listing of estimated ancillary/incidental costs <br /> ❑ Complete copies of all bids and other correspondence received in response to the RFB. <br /> All cost proposals should include the completed cost proposal breakdown, with task subtotals <br /> and a grand total cost for the entire scope of work. <br /> If you need assistance in procuring contractor and consultant services or if you have any <br /> questions, don't hesitate to call me. I can be reached at (916) 341 -5796. <br /> Sincerely, <br /> Mark Owens, Water Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> Cc : Ms. Carol Oz <br /> San Joaquin County Environmental Health Division <br /> 304 E Weber Avenue, 3`a Floor <br /> Stockton, CA 95202 <br /> California EavironmentalProtectron Agency <br /> ZK} Recyc%dPaper <br />