My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3147
>
3500 - Local Oversight Program
>
PR0544705
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2019 10:46:31 AM
Creation date
7/29/2019 10:40:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544705
PE
3526
FACILITY_ID
FA0003754
FACILITY_NAME
CALIFORNIA FUELS
STREET_NUMBER
3147
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512003
CURRENT_STATUS
02
SITE_LOCATION
3147 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> S6 hst <br /> Multichannel Tubing Seals & Packers <br /> -_� A multilevel well that uses a continuous length of The CMT tubing can be sealed in place with sand and <br /> -- multichannel tubing has the advantage over other bentonite layers in the usual manner using a tremie pipe <br /> multilevels in that there are no joints. This significantly - - or with the Solinst Mini Sand Bentonite Injector, Model <br /> r reduces the cost of installing wells and at the same time 561M. If the application is in loose sands, direct burial <br /> I. . increases the reliability of the system. The CMT tubing can be used, allowing the sand to collapse around the <br /> I— is very simple and convenient to use, as it gives full tubing. Pre-packed bentonite seals. are also available <br /> flexibility as to where monitoring zones are located, and which have bentonite pellets inside a plastic mesh, so <br /> q a one length of tubing can be used for a number of well that they can be slipped onto the tubing and then <br /> 11 installations. It has a ridge down its entire length to clamped quickly in piece priortoinstallation. <br /> — allow for easy identification of specific channels. <br /> Ports and packers can be assembled onto the tubing in a A <br /> the field, immediately after drilling, to reduce open hole <br /> time and potential cross-contamination between zones. - - <br /> i : . <br /> Plan View of <br /> 4 CMT-Tubing <br /> Pre-packed Bentonite Packer Double-Acting Packers <br /> Ridge - Double-Aciina inflatable Packers' are ideal for use in <br /> -^' situations where a CMT System is to be put inside an <br /> ' "t=" existing casing, or in a smooth rock borehole and when <br /> Port Inlet Holes �"� removal of the system for decommissioning or cause is - <br /> _ important. <br /> Double Acting Packers have a ribber gland on the inside <br /> as well as the outside. Both glands inflate and deflate at <br /> Polyethylene the same time. When a vacuum is applied to a packer, <br /> Hot Melt Seal the inner gland retracts and the packer slides easily into <br /> Foam Plug position on the CMT tubing. <br /> Air Vent Hale ��. The vacuum is then released so that the packer grips <br /> onto the tubing and a clamp top and bottom ensures <br /> - " that the packer does not shift position during installation. <br /> I-� To create a port: channel is sealed holes are drilled intoLF <br /> the tubing and covered by a stainless steel screen or <br /> pre-packed sand pack. <br /> Ports <br /> J The number and location of ports may be determined in <br /> advance of drilling, or after coring. Holes are drilled in t <br /> a vertical line into a given channel at a specified depth <br /> according to the zone to be monitored, forming a port. <br /> The channel is sealed with a polyethylene sealant below & - v <br /> the port openings and a vent hole is left just below the a N <br /> seal to allow air to escape as the system is lowered into <br /> the hole. Inflating the <br /> A stainless steel mesh is fixed in place over the port to - Applying a Sliding the packer Double-Acting <br /> prevent fines from entering, or pre-packed sand packs vacuum into position Packers <br /> are clamped onto the tubing over the holes. The screen The packers are connected in line with flexible inflation <br /> J kits come in a variety of mesh sizes, complete with tubing, and after installation into the well an inflation <br /> clamps, hot melt polyethylene glue and plugs. vessel is flied with water and an air source is used to <br /> Each channel is sealed at the bottom to prevent cross hydraulically inflate the packers, <br /> contamination, and a vent hole is cut into the channel Systems using Double Acting Packers can easily be <br /> —� just below the port. This allows water from the removed and the packers used elsewhere or in some <br /> monitoring zone to fill the channel below the zone, - cases the system may be repositioned so that the ports <br /> avoiding buoyancy. A -- are located at different depths within the same well. <br /> " Patents Pending <br /> 'J High Quality Groundwater iWonitoring Instrumentation s <br />
The URL can be used to link to this page
Your browser does not support the video tag.