My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3147
>
3500 - Local Oversight Program
>
PR0544705
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2019 10:46:31 AM
Creation date
7/29/2019 10:40:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544705
PE
3526
FACILITY_ID
FA0003754
FACILITY_NAME
CALIFORNIA FUELS
STREET_NUMBER
3147
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512003
CURRENT_STATUS
02
SITE_LOCATION
3147 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Overview Monitoring Your CMT Multilevel <br /> There are many options for the installation of a CMT System Water levels can be accurately, established using the Sofinst Mini <br /> depending on the lithology and project requirements. Typical 101 Water Level Meter The Mini 101 is ideal for use in shallow <br /> installation options include: CMT Systems. Lengths of 30 ft, 65 ft, 10m or 20m. of the <br /> i • Consolidated Boreholes (Bedrock) narrow 1/4" (6 mm) tapeare mounted on a convenient small <br /> Zones may be isolated with: reel. A narrower Model 102 coaxial cable Water Level Meter <br /> a) Double-Actino Packers for 3" (75 mm) diameter or larger may be easierfor use in deeper CMT Systems. <br /> boreholes <br /> - - "I b) Sand and bentonite lavedrig, tremied or injected <br /> C) Pre-formed Bentonite Packers for 3" (75 mm) diameter <br /> or larger boreholes <br /> s Uncnnsolidated Sediments (Overburden) <br /> .� Install the CMT System: so a) using sediment aollanse around tubing, in collapsing <br /> formations using 2" (50 mm) or larger drive casing <br /> b) within well casing, with screened intervals at the desired <br /> monitoring zones, and using options for consolidated holes <br /> c) within driven temporary casino or hollow stem augers: Solinst #410 Peristaltic Pump <br /> - using sand and bentonite layering, tremied or injected An accurate 114 " (6mm) <br /> _ - using pre-formed bentonite packers and screens flat tape and probe. <br /> Temporary casing has the advantage that it avoids redistribution Sampling can be performed using the Solinst Model 410 <br /> of soil and contaminants and thus potential positive biases. Air Peristaltic Pump, a small lnertiat WaTerra Pump, or a single <br /> rotary, cable tool, sonic and large direct-push (DP) rigs can all valve pump. <br /> _ <br /> be used to advance temporary casing. The smaller sonic and <br /> direct-push rigs also offer easy-access advantages. CMT System_ Sizes . <br /> The tubing is available in lengths of 100' , 200' & 300' (30m, <br /> y—x 60m and 90m). If deeper multilevels me desired the Waterloo <br /> . - .' Multilevel System can be considered. (See Data Sheet 401 .) <br /> The 1 . 7" O.D. CMT tubing (43.2 <br /> t, mm) has 7 channels. Although not <br /> circular, the ID of the 6 outer <br /> channels are approximately 7/16" <br /> (11mm) and the smaller central <br /> channel is 3/8" (9 . 5mm). The <br /> tubing coils are approximately 4 ft. <br /> (1.22 m) in diameter. <br /> .4 .support stand eases The fully prepared CMTWhen a CMT System is to be <br /> the preparation of ports. System is lowered into �k'^� ti installed throucth narrowdiameter <br /> the hole. a direct push eautpmen[ using direct <br /> s, 4 burial with formation collapse <br /> Typical Installation Procedures r ,�� ", - ., around the system, the port screens <br /> ` r <br /> The CMT Multilevel <br /> be held in place using low is completely built above ground and then i profile clamps. These give an <br /> inserted into the borehole. A set of appropriate installation . t* ' overall diameter of 1 . 75" (44.45 <br /> tools is available to suit each CMT System. A support stand is <br /> mm) tothe 1. 7" system. The <br /> eeommendedTo-holdfi#re-tubing�tra-comment position-while- -regu ar camps givl a an overall <br /> the ports are drilled and sealed. - diameter of 1. 9" (48.26 mm) when <br /> Installation is simple. After drilling the hole, lay out the CMT packers or sand packs are not used. <br /> tubing, mark the zones to be monitored and prepare the port _ Pre Packed bentonite packers and <br /> inlet holes. If packers and/or sand packs are to be used, slip Double-Acting Packers are <br /> -- them into position. When sand packs are not to be used, available in a variety of diameters <br /> screens are placed over the port inlet holes. to suit different sized holes. <br /> The CMT System can than be lowered into the hole. Double- Pre-packed sand hacks are <br /> ed out is lay <br /> ed Acting Packers are inflated or time is given to allow Pre-formed CMT tubing <br /> on the ground or plastic available with different sizes of <br /> - Bentonite Packers to expand, and monitoring can begin as sheeting for ports to be screen mesh and different sizes of <br /> soon as hydraulic and hydrogeochemical equilibrium has been prepared and placement sand, to suit hydrogeologic <br /> -. re-estabished. ofpackers. conditions. <br /> J High Ouatity Groundwater Monitoring Instrumentation sohnst <br />
The URL can be used to link to this page
Your browser does not support the video tag.