My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3147
>
3500 - Local Oversight Program
>
PR0544705
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2019 10:46:31 AM
Creation date
7/29/2019 10:40:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544705
PE
3526
FACILITY_ID
FA0003754
FACILITY_NAME
CALIFORNIA FUELS
STREET_NUMBER
3147
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512003
CURRENT_STATUS
02
SITE_LOCATION
3147 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Additional Assessment &SVE Feasibility Testing Work Plan - June 2008 <br /> PACIFIC PRIDE - SOUTH EL DORADO <br /> 3147 South El Dorado Street, Stockton, California <br /> 1.0. INTRODUCTION <br /> Advanced GeoEnviromnental, Inc (AGE) has prepared this workplan for performance of soil vapor <br /> extraction (SVE) feasibility pilot study at 3147 South El Dorado Street, Stockton, California (site); <br /> additionally, the work plan includes the installation of one additional ground water monitoring well <br /> to assess ground water-impact southeast of the site. The scope of work includes (1 ) installation of <br /> one ground water monitoring well, (2) installation of three soil vapor extraction (SVE) wells, (3) <br /> performance of an 8-hour soil vapor extraction pilot test, and (4) preparation of a report of findings <br /> with recommendations. The location of the site is illustrated on Figure 1 . A plan of the site is <br /> illustrated on Figure 2. <br /> AGE previously made recommendations (Site Conceptual Madel, dated 10 May 2007) to the San <br /> Joaquin County Environmental Health Department (SJCat a field scale pilot test should be <br /> performed at the site to evaluate feasibility of SVE. O s March 2008, the SJCEHD approved <br /> AGE' s recommendation for an SVE pilot test and directed by letter that a workplan for an SVE pilot <br /> test and additional ground water assessment southeast of the site be submitted to the SJCEHD for <br /> review (Appendix A). <br /> The purpose of this work plan is to detail the installation of one ground water monitoring well, three <br /> SVE wells and performance of an SVE pilot test at the site. This work plan has been prepared in <br /> accordance with guidelines issuedbythe California Regional Water Quality Control Board - Central <br /> Valley Region (RWQCB) for investigation of underground storage tank (UST) sites. A summary of <br /> previous investigations at the site was included in the AGE-prepared Site Conceptual Model, dated <br /> 10 May 2007, <br /> 2.0. SCOPE OF WORK <br /> Based on historic results of soil and ground water monitoring data collected from the site, AGE <br /> proposes to install one ground water monitoring well (MW- 13) within the turn lane on South El <br /> Dorado Street,, and three—SV) wells-(VW=1 ,—VW 2 and VW:3) inthe vicinity of the e- ` g UST <br /> area; the proposed well locations are depicted on Figure 2. rrner— <br /> Following installation of the above SVE wells, AGE proposes to conduct one, 8-hour SVE pilot test <br /> at the site; SVE pilot testing will be conducted from a selected SVE well (screened 10 to 30 feet). <br /> Drilling and SVE pilot test activities will consist of the following tasks : <br /> • Permitting and pre-field work activities; <br /> Advanced GccEnvironmen[al, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.