My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
SITE INFORMATION AND CORRESPONDENCE CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 11:51:33 AM
Creation date
7/30/2019 11:41:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I� <br /> GeologicafTechnics Inc. ; $ _ <br /> 2741 River Road b JL'?.. 2 <br /> Modesto,California 95351 <br /> (209)538-6424/FaX#538-5852 <br /> July 16, 1996 <br /> GTI Project No.: 358.3 <br /> GTI Project Name: Bank of Stockton (Western Lift) <br /> Mr. Steve Parada <br /> - — - State'Water Resources°ControlBoard <br /> UST Cleanup Fund <br /> 2014 T Street, Suite 130 <br /> P.O. Box 944212 <br /> Sacramento, CA 94244-2120 <br /> RE: USTCFP, Reimbursement Request Process, Claim.Number 1878 <br /> Western Lift, 3430 & 3422. S. EI Dorado , Stockton, CA <br /> Project Status <br /> Dear Mr. Parada: <br /> This is in reference to your letter of July 3, 1996 to the Bank of Stockton regarding UST <br /> corrective action and reimbursement. On behalf of the Bank of Stockton, I would like to <br /> inform you of the status of the project and address the issues raised in your letter. <br /> Project Status Status Report <br /> Since the last payment request was processed by the fund in August 1994, a number of <br /> changes have occurred, both at the site and the in regulatory environment. The <br /> following pointssummar-ize�so-me.of the:key events. <br /> June 1991 Three former USTs were removed and over excavated. <br /> 6/92-6/93 A total of 5 groundwater monitoring wells were installed, and monitoring <br /> commenced. There has been a small and decreasing level of benzene in <br /> the groundwater samples. <br /> Sept 1995 Bank of Stockton was issued a directive by the LOP to submit a Work Plan <br /> for a remedial action feasibility study. On September 28, 1995 a Work <br /> Plan was submitted to the LOP and a revised copy was submitted on <br /> October 31, 1995. <br />
The URL can be used to link to this page
Your browser does not support the video tag.