Laserfiche WebLink
MAR-25-1995 11:32 FROM GEOLOGICAL TECHNICS TO 4640138 P.02 <br /> Cjeofog ca(Te-chnw* s Inc. <br /> 27419qpper*jwd <br /> Maks D,C ftmis 95351 <br /> Pmjech 13oMEI Dorado) <br /> Project No.:3583 <br /> March 25,1996 <br /> Mr.Harlan Knoll,REH,S <br /> San Joaquin County PHS/FHD <br /> P.O:Box 388 <br /> Stockton,CA 95201 <br /> RE: viiS" LIFT'-3430 S EL DORADO,STOCKTON <br /> UST FUNDING-FEASIBILITY STUDY <br /> Dear Mr.Knolh <br /> You have directed the Bank of Stockton to conduct a remedial action feasibility study at the <br /> Western Lift site. The UST Fund issued a pre-approval for the work in 1995. Due to the <br /> changes in UST funding preceedure resulting from the LLNL study, I requested that you re- <br /> issue the Work Plan Approval and that the UST Fund confirm the pre-approval of the <br /> expenditure. On March 18, 1996, I had a telephone discussion with Mr_ George Lockwood at <br /> the UST fi=d to discuss the status of the pre-approval. <br /> While Mr.Lockwood has not yet reviewed the file,he stated that he would have a great deal of <br /> difficulty in approving an expenditure involving engineered remediation on a site involving <br /> the low levels of hydrocarbons being detected at the Western Lift Site. Upon further <br /> discussion, Mr. Lockwood stated that he would call you soon to discuss the matter and to <br /> attempt to arrive at a mutually agreeable solution to the funding matter. <br /> The Bank of Stockton intends to postpone the unplementation of the Work Plan until the <br /> matter is resolved between the govmunental agencies involved. <br /> Any questions of a technical nature may be addressed to me. Thank you for you attention to <br /> this mater. <br /> Sy, <br /> Steve Lankford <br /> Registered Geologist <br /> cc:John Urrutia,Bank of Stockton <br /> TOTAL P.02 <br />