Laserfiche WebLink
GeofogicafTechnics Inc. §_a �x SE,;-F4� �° ► ������_Tit <br /> 2741 River Sqad <br /> Modesto,Caf�Prnia 95351 x• t <br /> (209)538-6424/Fax#538-5852 w' �$�.,� 'R ' <br /> Project:BofS(El Dorado) <br /> Project No.:358.3 <br /> March 25,1996 <br /> Mr.Harlan Knoll,REHS <br /> San Joaquin County PHS/EHD <br /> P.O.Box 388 <br /> Stockton,CA 95201 <br /> RE: WESTEN LIFT-3430 S EL DORADO,STOCKTON <br /> UST FUNDING -FEASIBILITY STUDY <br /> Dear Mr. Knoll: <br /> You have directed the Bank of Stockton to conduct a remedial action feasibility study at the <br /> Western Lift site. , The-UST Fund issued a pre-approval for the work in 1995. Due to the <br /> changes in UST funding preceedure resulting from the LLNL study, I requested that you re- <br /> issue the Work' Plan Approval and that the UST Fund confirm the pre-approval of the' <br /> expenditure. On March 18, 1996, I had a telephone discussion with Mr. George Lockwood at <br /> the UST fund to discuss the status of the pre-approval. <br /> While Mr. Lockwood has not yet reviewed the file,!he stated that he would have a great deal of <br /> difficulty in approving an expenditure involving engineered remediation on a site involving <br /> the low levels of hydrocarbons being detected at the Western Lift Site. Upon further <br /> discussion, Mr. Lockwood stated that he would call you soon to discuss the matter and to <br /> attempt to arrive at a mutually agreeable solution to the funding matter. <br /> _—`"``The'Bank' of Stockton intends td postpone=tne imple`mentat'ion of the-4vork' lan until-the- <br /> matter is resolved between the governmental agencies involved. <br /> Any questions of a technical nature may be addressed to me. Thank you for you attention to <br /> this mater. <br /> Sinter ly, <br /> Steve Lankford <br /> Registered Geologist <br /> cc:John Urrutia, Bank of Stockton <br /> Y <br />