My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
SITE INFORMATION AND CORRESPONDENCE CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 11:51:33 AM
Creation date
7/30/2019 11:41:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Geofiogica[Tecfmics -Inc* <br /> 2741 Y4ver Agad <br /> Mo&,W,California 95351 <br /> (209)538-6424/S4x#538-5852 <br /> March 4, 1996 <br /> GTI Project No.: 358.3 <br /> GTI Project Name: Bank of Stockton (Western Lift) <br /> Mr. George Lockwood <br /> State Water Resources Control Board <br /> 2014 T Street,Suite 130 <br /> P.O. Box 944212 -- <br /> Sacramento,CA 94244-2120 <br /> RE: USTCFP, Reimbursement.Request Process, Claim Number 1878 <br /> Western Lift, 3430 S. EI Dorado , Stockton, CA - <br /> Proposed Feasibility Work Plan and Cost Estimate <br /> Dear Mr. Lockwood: <br /> On September 6, 1995 the Bank of Stockton was issued a directive (copy,attached) by. .* <br /> the LOP to submit a Work Plan to.conduct a-feasibility study to determine the best <br /> method of final remedial action. On September 28, 1995 a Work Plan was submitted to <br /> the LOP and a revised copy was submitted on October 31, 1995. <br /> The LOP approved the Work Plan on November 9, 1995. On November 15, 1995 a pre= <br /> approval request was submitted to the UST fund to cover the costs associated with the <br /> activities set forth in the Work Plan. On November 29, 1995, the UST Fund granted <br /> pre-approval of the feasibility study. The Bank of Stockton had indented to commence <br /> work in January of 1996. <br /> Shortly after the first of the year, the UST Fund, the LOP and everyone connected with <br /> LUST sites encountered a wall of uncertainty regarding reimbursement. This was a <br /> result of the LLNL study and the changes that are anticipated by the AB 1754 Advisory <br /> Committee and the State Water Resource Control Board. 'In order avoid the possibility <br /> of encountering reimbursement problems, on January 12, 1996, the Bank of Stockton <br /> requested that the LOP re-issue its directive to perform the Feasibility Study. On . <br /> February 22, 1996, the directive was re-issued by the LOP (copy attached). <br />
The URL can be used to link to this page
Your browser does not support the video tag.