My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
SITE INFORMATION AND CORRESPONDENCE CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 11:51:33 AM
Creation date
7/30/2019 11:41:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> Geofogicat Technics <br /> 9 <br /> 2741 Xiver Agar[ ;; R,'40" <br /> ,r ,. � , . <br /> Mo,,&sto,Cafyf pmia 95351 <br /> (209)538-6424IFax*538-5852 . 95-1 NOV —.9,' ,PM 1: 48 <br /> GTI Job#358.3 <br /> November 7, 1995 <br /> Mr. Harlan Knoll,REHS <br /> San Joaquin County PHS/EHD <br /> P.O. Box 388 <br /> Stockton,CA 95201 <br /> RE: WESTEN LIFT 3430 S-EI:DORADO;5 T OCKTON_- <br /> Dear Mr. Knoll: <br /> This is to confirm our telephone conversation today pertaining to additional <br /> grounwater monitoring at the subject Site. Have have asked the the Bank of Stockton <br /> prepare a Work Plan to accomplish the following objectives: <br /> • Verify depth to groundwater in-the five monitoring wells. <br /> • Purge sample,and anaylize monitoring wells MW-1,MW-4,and MW-5. <br /> • Sample and analyze the domestic water well at the site. <br /> • Submit the samples to a state certifie laboratory and test for 1)TPH as gasoline,2) j <br /> TPH as diesel,and 3)BTEX. <br /> I <br /> • Have the existing five monitoring wells surveyed by a licensed surveyor. <br /> - It:is anticipated this work M-11 be performed in the n ext-2>weeks. .I will inform-you of-- _. <br /> the schedule upon approval.of the Bank of Stockton. <br /> i <br /> Sincerely, <br /> i <br /> Steve Lankfor <br /> Registered Geologist <br /> I <br /> cc:John Urrutia, Bank of Stockton <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.