Laserfiche WebLink
1 <br /> 10 HEALTH AND SAFETY PROGRAM <br />' Phase One Environmental Inc has incorporated the following health and safety precautions while working on <br /> sites containing unidentified hazardous waste Once the nature and extent of contamination has been <br />' determined, additional work on site will be met with the proper precautions <br /> 1 I Workers Health and Safety <br />' I I 1 Work Space Safety <br /> The perimeter of the work space should, if possible, be 20 feet from the drilling rig or excavation site All work <br /> performed in publicly accessible areas will have a working perimeter to be marked by brightly colored <br /> delineators No unauthorized personnel will not be allowed access into the work space <br /> The project supervisor will coordinate all field activities and maintain the safest possible working environment <br /> at all times If an emergency occurs,the supervisor will immediately contact the proper authorities <br />' I 1 2 Skrn and Head Protectran <br /> Disposable suits, boots, and gloves will be worn when the working conditions require such precautions <br /> Disposable plastic gloves will be worn at all times during soil and groundwater sampling The gloves will be <br /> changed after each sample has been collected <br /> Used disposable clothing will be properly discarded at the end of each working day <br /> Hard hats will be worn during drilling,excavation, and other activities in which potentially dangerous equipment <br /> is being operated within the work space <br /> 1 2 Health and SafetyAgencies <br /> 1 County Department of Environmental Resources <br /> Name Margaret Lagorio <br /> Phone No (209)468-3450 <br />' 2 Fire Department <br /> Name Stockton Fire Department <br /> Phone No 911 <br />' 3 Company Health and Safety Coordinator <br /> Name Steve Lankford <br />' Phone No (209)569-0293 <br /> 13 Hospital Location <br />' In case of accident or emergency the following route will be used to transport any injured person to the hospital <br /> Take El Dorado south 1 6 miles to Hospital Road, then <br />' Turn right(west)and proceed under along Hospital road under the 1-5 freeway a total of 0 5 miles,then <br /> Finally,turn left into the grounds of San Joaquin General Hospital <br /> 20 QUALITY ASSURANCE PROGRAM <br /> The following measures will be taken by Phase One Environmental Inc to ensure that a high quality study is <br /> conducted and that cross contamination does not occur <br />