My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 2:29:12 PM
Creation date
7/30/2019 1:44:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L s h <br /> . f <br /> State Water Resources Control''Board <br /> Division of Financial Assistance <br /> 1001 1 Street-Sacramento,California 95814•(916)341-5796 <br /> Winston H.Hickox Mailing Address: P.O.Box 944212-Sacramento,California•94244-2120 Gray Davis <br /> Secretaryfor FAX(916)341-5806•Internet Address: http://www.swreb.ca.govirwphorne/ustef Governor <br /> Environmental <br /> Protertian <br /> February 13, 2003 E� @ <br /> Dan Smith FEB 2 1 2003 <br /> Manna Pro Corporation FNVlfiO <br /> 707 Spirit 40 Park Drive PERM[/SERV1%`1ES <br /> St. Louis, MO 63005 <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 678, <br /> SITE ADDRESS: 4004 S El DORADO, STOCKTON <br /> I have reviewed your request, received on January 1, 2003, for pre-approval of corrective action <br /> costs. I have included a copy of the "Cost Pre-Approval Request" form; please use this form in <br /> the future for requesting pre-approval of corrective action costs. <br /> With the following provisions, the total cost pre-approved as eligible for reimbursement for <br /> completing the work associated with the December 27, 2002, cost estimate by Geo-Phase <br /> Environmental (GPE),is $213,320. The costs associated with remedial system va or extraction <br /> and air spar el are pre-Mproved for the amount shown above see the table below for a <br /> breakdown of costs). <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Task Amount Pre-Approved Comments <br /> I Project Planning labor excessive- <br /> Project Planning 9,940 reduced to 50 hrs @ $105/hr. <br /> Other costs OK as submitted. <br /> 2 i Drilling(10 VE and 8 sparge 61,508 <br /> wells <br /> 3 Remedial System Installation 42,220 <br /> 4 Monitoring equipment not pre- <br /> approved. At time of <br /> 1 Year System78 946 reimbursement request submittal, <br /> Monitoring/Maintenance Fund will reimburse the more cost <br /> effective-purchase vs.rental of <br /> monitoringa ui ment. <br /> 5 Waste Soil Disposal 3,756 <br /> 6 Installation of remedial system and <br /> Reporting 10,650 start-up ($4,110) and 4 quarterly <br /> system status reports($6,540). <br /> CaliJorura En vironmental Protection Agency <br /> Z,� Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.