My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 2:29:12 PM
Creation date
7/30/2019 1:44:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Smith -2- February 13, 2003 <br /> # Task Amount Pre-Approved Comments <br /> Labor rate reduced to $105/hr <br /> 7 Project Management 6,300 refer to Fund Cost Guidelines). <br /> F <br /> TOTAL PRE-APPROVED $213,320 <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: necessary (as <br /> determined by the Fund) corrective action costs for work directed and approved by the San <br /> Joaquin County Environmental Health Department(County) will be eligible for <br /> reimbursement at costs consistent with those pre-approved in this letter. However, depending on <br /> what happens in the field, some costs may not actually be necessary. If the Fund agrees that they <br /> were in fact necessary,the Fund will reimburse at reasonable rates (rates consistent with those <br /> pre-approved). <br /> In order for future costs for corrective action to be part of the expedited reimbursement <br /> process, they must be pre-approved in writing by Fund staff. <br /> All costs for corrective action must meet the requirements of Article 11, Chapter 16, <br /> Underground Storage Tank Regulations in order to be eligible far reimbursement. <br /> • The Fund will review any tasks/costs that go beyond the pre-approved amount to be <br /> determined if the additional tasks and costs are necessary and reasonable. However, if costs <br /> exceed the above pre-approved amounts, the Fund will be unable to expedite your <br /> Reimbursement Request. <br /> • The work products must be acceptable to the County. <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the GPE proposal in my pre-approval above, please be aware that <br /> you will be entering into a private contract: the State of California cannot compel you to sign <br /> any specific contract. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services, don't hesitate to <br /> call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown of costs on a time and materials basis, that <br /> California Eaviroumenta/P.ratection Ageflcy <br /> 0,R"Y,*dPW, <br />
The URL can be used to link to this page
Your browser does not support the video tag.