My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 2:29:12 PM
Creation date
7/30/2019 1:44:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manna Pro Corporation -2- June 19, 2001 <br /> Claim No. 000678 <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Task* Amount Pre-Approved Comments <br /> I Project Preparation $1,740 Planning, Permitting <br /> 2Drill and install one 55' sparge <br /> Air Sparge Well Installation $3,439 well <br /> 3 Interim Remedial System $18,563 <br /> Installation <br /> 4 System Monitoring/Maintenance $8,213 <br /> 5 Waste Disposal $1,026 <br /> 6 Reporting(Interim Remedial $1,190 <br /> Action Re)Rort <br /> 7 Project Management $ 768 <br /> TOTAL PRE-APPROVED $34,939 <br /> * Task descriptions are the same as those identified in Geo-Phase Environmental,Inc.'s May 30,2001 cost <br /> estimate. <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The Fund will <br /> review any tasks/costs that go beyond the pre-approved amount to be determined if the <br /> additional tasks and costs are necessary and reasonable. However, if costs exceed the above <br /> pre-approved amounts, the Fund will be unable to expedite your Reimbursement Request. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the Geo-Phase Environmental, Inc. proposal in-my pre-approval <br /> above, please be aware that you will be entering into a private contract: the State of <br /> California cannot compel you to sign any specific contract. This letter pre-approves the <br /> costs as presented in the proposal dated May 30, 2001 by Geo-Phase Environmental, Inc. for <br /> conducting the work approved by the County for implementing the February 16, 2001, Geo- <br /> Phase Environmental, Inc. workplan. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services, don't hesitate to <br /> call me. <br /> California Ea vironmental Protection Agency <br /> 04 Ri yded Pnper <br />
The URL can be used to link to this page
Your browser does not support the video tag.