My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 2:29:12 PM
Creation date
7/30/2019 1:44:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL TS�V��I�TjI <br /> 710W GROUNDWATER <br /> 11:1D1:1 TECHNOLOGY ® 91 DEC -5 PM 2004 GroundwaterTechnology,Inc. <br /> 4057 Port Chicago Highway,Concord,CA 94520 USA <br /> Te1:(510)671-2387 Fax:(510)685-9148 <br /> November 29, 1994 <br /> Mr. Harlin Knoll <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 445 N. San Joaquin Street <br /> Stockton, CA 95201 <br /> Subject: Plot Testing Report and Conceptual Corrective Action Plan - Executive Summary <br /> Supplemental Evaluation of Best Available Technology (BAT) <br /> Manna Pro Corporation Facility <br /> 4004 S. EI Dorado, Stockton, CA <br /> Dear Mr. Knoll: <br /> This letter serves to transmit the Executive Summary and BAT Evaluation you requested for the Manna <br /> Pro remedial action program. These documents have been prepared to assist you In your public notice <br /> requirements for the site. <br /> As we have discussed, we are currently preparing the final design for the treatment system and remedial <br /> well field. The final design process will verify the appropriate number and location of wells necessary to <br /> address the existing hydrocarbon plume In groundwater, as well as the number of vent points to address <br /> the Impacted vadose zone. In addition, the final design will contain the engineering drawings and <br /> equipment specifications necessary to obtain construction permits for the treatment system. <br /> If you have any questions, please call me at (510) 671-2387. <br /> Sincerely, <br /> GROUNDWAT T LOGY, IN . <br /> Richard M. <br /> Project Manager <br /> Attachments <br /> cc: Mr. Lary Chapman, Manna Pro Corporation, St. Louis, MO <br /> Dean Wills, Esq., O'Melveny and Myers, Los Angeles, CA <br /> Ms. Elizabeth Thayer, RWQCB Central Valley Region, Sacramento, CA <br /> EXSUMCVL.1 <br /> Oftes throughout the U.S.,Canada and Overseas <br />
The URL can be used to link to this page
Your browser does not support the video tag.