Laserfiche WebLink
iv uc lire+ l: 10 U IML�VtNT 6, 1ITt-Ks L.i-s, c13 565 7467 P.56 <br /> Manw No Co 1 Qlian Ik <br /> Re-&wmdon Work Plan li <br /> Page: 2 <br /> a depth of 20 feet. Two sunples will be taken in each wall of the excavation and four <br /> samples will be taken on the floor of the excavation (Figure 6). The storage of <br /> : contaminated soil wiU be on asphaltic concrete due east of the prop <br /> ,, F posed excavation and <br /> WW be covered with visquoen plastic. An aeration permit will be filed with San <br /> E Joaquin Air Pollution District by WI-M Environmental for remediation of the stored <br /> soil. <br /> E <br /> S.0 SOIL Srf hfPlING <br /> Sampling will be conducted under the direction of San Joaquin Environmental Health r <br /> Department by a State certified laboratory. All soil sampling equipment will be � <br /> thoroughly cleaned before and between sampling to prevent cross contamination. The <br /> laboratory samples will be taken with clean brass tubes and immediately sealed, without <br /> head space, using aluminum foil lined caps. <br /> Soil samples collected for analysis will be analyied using EPA method 8015 modified <br /> for total petroleum hydroa bons, EPA method 8020 for BTUE compounds, and total <br /> lead. <br /> 6.0 11MMA77ONS <br /> This work plan is site specific to the former underground storage tank area and does not <br /> address any other area on the Manna Pro site. The scope of this work was defined by <br /> lab data supplied by others.;! Modification may be required when subsurface conditions <br /> become known. This work°plan has been prepared to the st2andards and practices of the <br /> industry and will be performed under the guidar_ce of a registered geologist. <br /> Ii <br /> i � F <br /> it � li <br /> I <br /> I <br /> I 1 <br /> I'� I <br /> I <br />