My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009405
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:04:06 PM
Creation date
7/30/2019 2:00:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009405
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u-C , <br /> 199 <br /> -1 :;:a2 O'MEL.EHY u MYERS �.R X13 65 ae7 P. 71 I <br /> WHF EnWmAmuual Consultow, Inc. <br />+ Health & Seery Plan <br /> Page: 3 <br /> i <br /> f i <br /> 2.0 SAFETY IMPLEt1lF.NTA77ON <br /> The provisions of the WHF Environmental Consultants, Inc. Health and Safety Plan <br /> are mandatory for all personnel associated with the site project and operations. <br /> A complete background review and site visitation will be conducted in order to <br /> determine whether specific amendments are to be made to the Health and Safety Pian <br /> based on specific characteristics which may exist on the job site. Any suspected <br /> hazards associated with the on-site operation which exposure to, via Lnhalation or skin <br /> absorption, to such as suspected carcinogens or human sterilants, will be documented <br /> r and specific guidance will be developed and added to this Health and Safety Plan as <br /> Appendices. <br /> 4 <br /> C A deftned project site layout is paramount to the safe completion of all remedial site <br /> investigations. The project site layout has built-in safety features. The site is divided <br /> into three zones. The following list defines the required personnel protective <br /> equipment. <br /> 2.1 Prsatrnel Protective Fgrripmev (PPE') <br /> Personnel who will be working in or around the exclusion zone of the job site <br /> will use the following protective equipmert and measures as warrant by the <br /> Project Manager: <br /> . . Coveralls as an undergarment <br /> - Satanex outer garment , <br /> Sample gloves ('inner) <br /> - PVC, Nitrile or Neoprene outer gloves <br /> Hard hat <br /> - Steel toe boots <br /> Robars or Tingley boots <br /> Y <br /> Full faeepieee respirator with R53HE camidges (a combination of <br /> *T organic vapor, acid gas, pesticide, radionuclide, high efficiency filter). <br /> Note that cartridges should be changed daily. <br /> - AN joints to be taped <br /> - Self-contained air will be utilized if project dictates <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.