My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009405
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:04:06 PM
Creation date
7/30/2019 2:00:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009405
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0'11E:LVFN'f & iT(EFE .Z-65 7467 P.22- <br /> ' <br /> � I <br /> WHF FAvilorimental Cortstdtanu, Inc. <br /> Heath do Wety Ply <br /> Page: 4 <br /> f: <br /> 1 1 <br /> More stringent protective equipment requirements will be implemented if <br /> necessary. This detennination will be made by the project supervisor after <br /> review of the materials to be handled, the ambient monitoring data, consultatiori' <br /> with on-site technical personnel, the Safety Officer, and the proper management' <br /> personnel. Upgrades in PPE, if necessary, will be implemented. <br /> 2.2 General Wety <br /> The on-site Safety Officer will be. responsible for the following daily safety <br /> implementations: <br /> 2.3 Baily Safety Meetings <br /> Each day prior to commencing work, a safeo meeting shall be held to discuss <br /> safety considerations for the days work ;o he done. A safety topic shall' be <br /> addressed each day from the foi?owing list: <br /> x <br /> Site Safety Plan (first day and once a week thereafter) } <br /> 5 <br /> Fire Fighting Techniques <br /> - Defensive Driving <br /> Decontamination <br /> Levels of Protecdon <br /> - Heat Stress <br /> Emergency Equipment on Site <br /> �4 - confined Space Entry Procedure - Respirator Maintenance <br /> - Self-contained Breathing Apparatus Training (if neoessary) <br /> 2.4 Safaty Log k <br /> A safety log shall be kept for the project work site. <br /> 1 <br /> 2.5 Eating, Drinking, Smoking <br /> i <br /> k Eating, drinking, and smoking shall be allowed only in the designatcd area in <br /> the support Zone. No personnel rray eat, drink, or smoke on-site in any other <br /> area except as permitted by the SSO. i <br />
The URL can be used to link to this page
Your browser does not support the video tag.