Laserfiche WebLink
i <br /> STI SPOO1 Annual Inspection Checklist <br /> General Inspection Information: <br /> �`/) In Ratan UnFll Data: (36 months from inspection date) <br /> Inspection Data: -1L_I <br /> Pru,Inspection Win: 1 1 -t9 Inspector Name: <br /> TarIke I.".t d OD B's): <br /> Inspection Guidance: <br /> s For equipment not included in this Standard,follow the manufacturer recommended Inspection'testing schedules and procedures. <br /> n The periodic AST inspection is intended for monitoring the external AST condlilon and its containment structure.This visual inspection does not require a Cerfigetl <br /> Inspector, It shall be performed by an owner's inspector who is familiar with the site and can Idanify changes and developing problems. <br /> Y ,lnterstice,or Will container, Before discharge to the <br /> Remove promptly upon discovery standing water or liquid in the primary tank,secondary containment area <br /> envirortntent,inspect the liquid for regulated products or other contaminants and disposed of It property. <br /> '> In order to comply with EPA SPCC(Spill Prevention,Control and Countermeasure)rules,a facility must regularly tent liquid level sensing devices to ensure proper <br /> operation(40 CFR 112.8(c)(8)(v)). <br /> q (')designates an Item in a non-conformance status,This indicates that acdOnis required to address 3 emblem. <br /> ➢ Nontonfonoing items Important tto k or conteTment insoriN require evaluation by an engineer asperianced in AST design,a CaN@ed Inspector,ora tank <br /> manufadumr who will determine the corrective adon.Note the m.,,niormance and corresponding corrective action in the comment section. <br /> r Retain the completed checklists for 36 months. <br /> D Complete this checklist on an annual basis supplemental to the ownar moot may <br /> affectteSIPCCrhomned Pig",the co <br /> > Note:B a change has occurred to the tank system or containment <br /> plan <br /> may affect the SPCC.plan,the condition should be evaluated against the torrent <br /> plan requirement by a Professional Engineer knowledgeable in SPCC development and Implementation. <br /> gam Task <br /> But= Cerumens i <br /> 1A Tank Containment yes' No WA <br /> 1.1 Containment Check for <br /> structure . Holes or cracks in <br /> comainmentwall <br /> or floor —�u��e wf'yi\� <br /> . Washout <br /> . 1-merdegradation <br /> . Corrosion <br /> . Leakage <br /> . Paint failure <br /> . Tanksettlin <br /> rag Tank Foundation and Supports Y Na <br /> 21 Foundation Settlementor <br /> foundation washout? <br /> 22 Concrete pad Creddng or spalling' Yes' No <br /> or ring wag <br /> 8 SEPTEMBER2011 <br /> AST INSPEDTDN STANDARD <br /> COPYRIGHTO 2011 Steel Tank Institute <br />