Laserfiche WebLink
STI Spool Month Ins ection Checklist <br /> General ins ection Information: (da monmstrom Inspection dare) <br /> 10c Retain Until Dale: <br /> nspecdon Date <br /> Inspector Name: <br /> Prior lnspectlon Date: <br /> Tanks Inspeded(ID ail <br /> inspection Guidance: schedules and procedures. <br /> > died <br /> For equipment not included in this Standard,follow the menuiaduar recommandetl io h eounbur sang <br /> tio <br /> I The periodic AST Inspection is intended for monagring the extamal AST condition andlt8 mmaulnrard changes <br /> a.This visual I pr a tem does not require a CEN <br /> Inspector It shall be performed by an owners impeder who is familiar with the site and can idendP/Chang ofd pmperly.pl�problems. <br /> n Upon discovery of water In the Pops12d:m17u��,y cont inmentproducarea <br /> other t1w.or <br /> spill centers <br /> nterand in remove <br /> ve prpmptlyEr take other gortedive action.Before <br /> discharge to the environment,Iasped <br /> airedntaddressap OfA are took <br /> ireerexF rhurced In AST design,a Certified Inspector, <br /> ➢ (")designates an kem in a nonconformance status.This Indicates that action's req m coned a action In the comment section. <br /> Y Non-conforming items) Itantt to ko co fa' <br /> ant IntegrltY require evaluation by an eng <br /> manutedurer who will determine the corredwe action. Note the non-conformance and correspond' 9 vents <br /> Y Retain the CAmplBted ch, Is for 35 montlu, that could affect the operation of critical compo <br /> v In the event of severe weather(snow,ice,wind storms)or maintenance(such as uireddasJ <br /> (normalands mergancy vents,vaWesh an inspection of Chase camponsnts is required as soon <br /> as the aquipmentla safely accessible after the event <br /> Comments <br /> Item <br /> Tasty Status <br /> 1.0 Tank Contalnmenl Ye=' No <br /> 1.1 Containment Check for water. <br /> structure debris,cracks or fire <br /> hazard Yea` No <br /> 1.2 Prima tank Check able and n a Yes No" <br /> 1.3 Containment Pe NIA <br /> chain valves dosed oslgon Y , <br /> 1.4 Pathways and Clear antl W <br /> entry gates/doors <br /> o sable <br /> 2.0 Leak Detection Visible s'Igns of Yes` No <br /> 2A Tank leaks e <br /> 2.2 Secondary <br /> Vksibl0 Signa of Yes' No <br /> Containment kage from bark <br /> Into secondary <br /> contalnmerrt Yes• No <br /> 2.3 Surounding Visiblesigreof W <br /> soil leaks Yee, N <br /> 2.4 lbsrstice Visible signs of WA <br /> I" e 4 SEPTWSER2011 <br /> AST INSPECTION STANDARD <br /> COPYRIGHT®2011 Steel Tank insfiM <br />