Laserfiche WebLink
I <br /> 3,0 Tank ui mant <br /> 3.1 Valves a.Check for leaks. Yes, No <br /> b.Tank drain valves Yes, No <br /> must be ke locked. NIA <br /> 3.2 Spill a.inspect for debris. a No WA <br /> containment residue,and water <br /> boxes on fill in the box and <br /> pipe ne a. <br /> b.Grein valves must as No NIA <br /> be operable and <br /> closed. <br /> 3.3 Liquid level a.Both visual and Ye No' WA <br /> equipment mechanial devices <br /> must be inspected <br /> for physical <br /> dam e. <br /> b. Check that me Yes NV W <br /> device is easily <br /> readable <br /> 3.4 Overfill a. If equipped with a Yes No' WA <br /> equipment "fesf'button, <br /> activate the audible <br /> horn or light to <br /> confine operation. <br /> This could be <br /> battery powered. <br /> Replace the battery <br /> Kneeled <br /> b. If overfi0 valve is Yes No' W <br /> equipped with a <br /> mechanical test <br /> mechanism,actuate <br /> the mechanism to �{y <br /> confirm patch. <br /> 3.5 Piping Check for leaks. es' No <br /> connections corrosion and <br /> dame <br /> 4.0 Tank Attachmenfs and A luatenances <br /> 4.1 Ladder and Securevdth W sign Ye No' <br /> Platform of severe corrosion A <br /> structure or damace? <br /> 5.0 Other Conditions <br /> 5.1 Are there other conomons that should yes. No <br /> be addressed for continued seta <br /> operation or that may affect the site spill <br /> revention lan7 <br /> SEPTEMBER 2071 <br /> AST INSPECTION STM2G11 INRO <br /> Ste <br /> 5 <br /> COPYRIGHT®26'11 Steel Tank Institute _ <br />