Laserfiche WebLink
STI SPOO1 Annual Inspection Checklist <br /> General ins action information: (36 months from inspection date) <br /> Relafn Unid Dale: <br /> Inspection Did.: <br /> ion Dais: �'�` Inspector Nems: <br /> Prior lnsped <br /> Ta*s hxsWoted OD#Q: <br /> Inspection Guidance: <br /> D For equipment not included in this Standard,fokow the manufebaer recommended inspecfionhesting schedules The visupRicatlnspe <br /> D 7he periodic AST <br /> Inspector It she l be InsPaCdom is by an owneYs lnspecicrhwho is idler With the site d can identify changes and developing Problemsdces not require a CeNfied <br /> D Remove promptly upon dscovely standing water or liquid in the primary tank,secondary cortiahmentama,interstice,or spilfcdntainer. Before dischargeto the <br /> environment,inspect the liquid for regulated products or other contaminants and disposed of It proof thy. <br /> Y In order to comply with EPA SPCC(Spill Prevention,Control and Countermeasure)rules,a facility must regularly am liquid level sensing devices to ensure proper <br /> operation(40 CFR 112,8(c)(8)(v)). <br /> ➢ (`)designates en Item in a nonuniormance status.This indicates that action is required to address pre em. <br /> 5~ manufactumri who will determine�he corteptive aldion�Note the noquire <br /> evaluation by odnande and menengineer <br /> experienced <br /> x eri a cad in AS dike design,a C section, ora tank <br /> Y Retein[he completed checkGsfs far 36 months. mental to the owner morNiy-perfwmadirarpectfon checklists.. <br /> > Complete this checklist on an annual basis supp <br /> Note:tla change has occurred to the tanksyetem or cgntammentthat mayaffeotflra SPCC plan,the condition sM1oultl be avalwted against fhesurren <br /> pWn requirement aY a Professional Engineer knowledgeable in SPCC devalopmentand implemerrfallon. <br /> Item Task <br /> Situs Comments <br /> 1.0 Tank Containment Yes" N N!A `� v�� <br /> i.i Containment Ch Holes or credos in �l} L\Q— �h�1 <br /> stru ure <br /> containment wall <br /> or floor <br /> Waste, <br /> • Liner <br /> Corms <br /> Leakage <br /> • <br /> Paint 11 <br /> Tankseltl' <br /> 2.0 Tank Foundation and Su orfs Y No <br /> 2.1 Foundation Settimartor <br /> founds lostwashmdo? <br /> 2.2 Concrete Pau I Crackingorspaltmg? Yes' No <br /> or ring wall - - 1 <br /> $ SEPTEMBER 2011 <br /> AST INSPE"CN STANDARD <br /> COPYRIGHT02011 Steel Tank institute <br />