Laserfiche WebLink
. ......._........... ... <br /> . . .. ... .. ..... .. ... .... . <br /> I <br /> STI SPOD1 Monthly Inspection Checklist <br /> General Inspection Information: <br /> . Qi p Risen IJM9 Data: (36 morilhsfrom insperich date) <br /> on- <br /> Inspection Date: 1 ( (C�7 <br /> Prior Inspection Date: <br /> fl- 79 —1 C1 Inspector Name: \ <br /> Tanks mspeded(ID x's): <br /> Inspection Guidance: <br /> ➢ For equipment not included in this Standard,follow the manufacturer recommended.nispectioNtespan schctulesaM procedures. <br /> Y The periodic AST Inspection is intended for monitoring the external AST condition and ds cenminmalrtatrugture.ThisYistml Inspection does not require a Certified <br /> Inspector. If shall be performed by an owner's Inspector who is familiar with the site and can identify changes and developing problems. <br /> a Upon discovery of water in me primary tank,secondary containment area,Interstice,or Will container,remove promptly a take other oonectivo action.Saturn <br /> discharge to the emircu ment,inspect the liquid for regulated products or other contaminants and disposed of It property <br /> > (')designates an item In a nonconformance status.Thislndicates that action is required to address a problem, or a tank <br /> > Non-conforming items' Donarrft tank r onta'nmentintegrliY require evaluation by an engimarexperienced in AST design,a Certified Inspector, <br /> manufacturer who will determine the corrective action.Note the non-conformance and corresponding corrective action in the comment section. <br /> > Paid,the completed checklists for 36 months, <br /> hence> In the event of severe weather(snow,loan wind <br /> than of thesearns)or lrdial compar parents is gsuch IS o red as soon as the equipmentis wkly accessible after the event. <br /> (normal and emergency vents,valves), <br /> Item <br /> Task Status Comments <br /> LO Tank Containment Yes` No <br /> 1.1 Containment CheWc for <br /> or fire <br /> structure debris, _ <br /> TN <br /> Mcnard No <br /> 1.2 Prima tank Ceack for waferYes No' <br /> J.3 ble Containment Operaand in a <br /> drain valves closed osition yes <br /> 1.4 Pathways and Clear and WA <br /> entry gales(tloors <br /> o rable <br /> 2.0 Leak Datectlon <br /> 2.1 Tank V..blesi: ac f Year <br /> lealescol <br /> 2.2 Secondary Visible signs of Yes' <br /> Containment leainto sectank <br /> onds <br /> con aiommt <br /> 2.3Sit rtaundin9 lrleible signs Of Yes' 'r <br /> soil lea NLA - r <br /> 2.41nterstice Visible signs of Yes NIA <br /> e <br /> AST INSPECTION STANDARD <br /> 4 SEPTEMBER 2011 <br /> COPYRIGHl@2011 Steel Tank institute <br />