Laserfiche WebLink
. ........ . <br /> I <br /> 3.0 Tank ui ment <br /> 3.1 Valves a.Check for leaks. YesNIA o <br /> b.Tank drain valvas Yes' No <br /> must be ke docked. NIA <br /> 3.2 Spill a.inspect for debris, No N/A <br /> cowainment residue,and water <br /> boxes on fill in the box and <br /> pipe remove. <br /> b.Drain valves must e' No N/A <br /> be operable and <br /> closed. <br /> 3.3 Liquid level a.Both visual and a No` WA <br /> equI merd mechanical devices <br /> must be inspected nn <br /> fur physical (-Ck 1—al9. <br /> dama e. J <br /> b.Check that the a No" WA <br /> device is amity <br /> readable <br /> 3A Overbill a. If equip pad WRh a No' N/A <br /> equipment -tms 'button, <br /> activate the audible <br /> hom or light to <br /> confirm operator. <br /> This could be <br /> battery powered. <br /> Replace the battery <br /> if needed <br /> b,if overfill vaNe is Yes No' <br /> equipped with e <br /> mechanical test p/ <br /> mechanism,actuate <br /> the mechanism to �J <br /> confirm o e2tion. <br /> 3.5 Piping Check for leaks, a No <br /> connections corrosion and <br /> dame <br /> 4.0 Tank Attachments and 3urtenances <br /> 4.1 Ladderare Secure with no sign No` <br /> platform of severe corrosion WA <br /> structure or dama e7 <br /> 5.0 Other Condif cM <br /> 5.1 Are there other conditions that should Yas' <br /> be addressed for continued safe <br /> operation athat may affect the site spill <br /> Prevention 'I <br /> SEPTEMBER 2011 <br /> INBPEGTION BO <br /> CO <br /> 5 <br /> COPYRIGHT'®2011 20t1 SSteel Tank institute _ _. <br />