Laserfiche WebLink
. .. ....... .. <br /> 3.0 TankE ui mant yam, <br /> 3.1 Valves a.Check for leaks. NIA <br /> b.Tank drain valves Yes` NoO <br /> must be No t locked. NIA <br /> 3.25pilt a, inspect for debris, V No NIA <br /> containment residue,and water <br /> boxes on fill in the box and <br /> pipe remove. <br /> b.DminvaNea must es No NlA <br /> be operable and <br /> dosed. <br /> 3.3 Liquid level a.Both visual and Ya No` NIA <br /> equipment mechanical devices <br /> must be inspected <br /> for physical r yv <br /> dame e. <br /> b.Check that the <br /> device is easily <br /> readable <br /> 3.4 Over511 a.If equipped the Yes No' <br /> equipment 'test'button, <br /> activate the audible <br /> hem or light to <br /> confirm operation. <br /> This could be <br /> battery powered. <br /> Replace the battery <br /> if needed <br /> b.If overfill valve is Yea No` NIA' <br /> equipped with a <br /> mechanical test <br /> mechanism,actuate <br /> the mechanism to <br /> u <br /> confirm eralien. <br /> 3.5 Piping Check for leaks, Y No <br /> connections corrosion and <br /> dams <br /> 40 Tank Attachments an urtananaea as No' <br /> 4.1 Ladder and Secure with no$we <br /> structure or damage?tform of severe rrosion fA <br /> 5.0 Other Conditions <br /> 5.1 Are there other conditions that should Yes' No <br /> be addressed for continued safe <br /> operation or that may affect the site spid <br /> Prevention pplan? 1 <br /> 5 SEPTEMBER 2011 <br /> ASTINSPECTON STANDARD <br /> COPYRIYRIGHT(02011 Steel Tank Insiifute — - <br />