Laserfiche WebLink
l <br /> STI SP001 Annual Inspection Checklist <br /> General inspection Information: <br /> Inspection Data: 1 _ I l n —t Q Retain Until Dale: (38 months from inspection date) <br /> Prior Inspection Date: —kJ —I Inspector Name: p �L 1"' <br /> Ll <br /> Tanks ImPOed(ID We): <br /> Inspection Guidance: <br /> n Forequipment notlncluded inthis Standard,followthemanufacturar recommended lnspectionksting schedulesandprooadures. <br /> n The periodic AST Inspection is intended for monitoring the external AST condition and its Iona mnentstructure.This visual inspection close et require a Certlhed <br /> Inspector. It shall be performed by an owner's Inspector who is familiar with the site and can identify changes and developing problems. <br /> Y Remove promptly upon discovery standing water or liquid in the primary tank,secondary wntalnment area,interstice,or spill container. Before discharge to the <br /> environment,inspect the Ilquld for regulated products or other contaminants and disposed of it properly. <br /> a In order te comply with EPA SPCC(Spill Prevention,CoMi and Countermeasure)rules,a facility must regularly test liquid level sensing devices to ensure proper <br /> operation(40 CFR 112.S(c)(8)(v)). <br /> Y I')designates an item In a minconfommance states.This indicates that action is required to address a problem. <br /> Y Noaronfarming items Important tank or containment require evaluation by an engineer.experienced in AST design,a Cenifte inspector,oto lank <br /> manufacturer who will determine the corrective ashon.Nate the non-conformance erd corresponding corrective action in sie comment section <br /> Y Retain the completed checklists for 36 months. <br /> > -perbrmed inspection checklists.Complete this checklist on an annual basis supplsmentalto the owner menihy <br /> a Note:If a change has occurred to the tank system or containment that may affect the SPCC plan;the condition should be evaluatad against the current <br /> plan requirement by a Professional Engineer knaMedgeable in SPCC development and Implementation. <br /> item Task Sol Commerr5 <br /> 1A Tank Containment <br /> 1.1 Containment Check for Ves' No <br /> structure • Holes or cracks in <br /> containment wall <br /> or four <br /> Washout <br /> Linerdegredation <br /> Corrosion <br /> . leakage <br /> Paintfailure <br /> Tank settlm <br /> fe Tank Founds and Su orts <br /> 2.1 Foundation Settlement or Y ` No <br /> foundation washout9 <br /> 2-2Concretepad Cracking or spelling? Yes' N <br /> or ring wall <br /> FST INSPECTION STANDARD 8 SEPTEMBER2611 <br /> COPYRIGHT@ 2011 Steel Tank Institute <br />