Laserfiche WebLink
SPCC PLAN REGULATORY CROSS-REFERENCE TABLE <br /> Section in <br /> 40 CFR this SPCC <br /> Section Description Plan <br /> Subpart A Applicability,Definitions,and General Requirements For All Facilities and All Types of Oils <br /> §112.1 through 112.7 <br /> 112.1 General applicability establishing procedures,methods and equipment Entire Plan <br /> and other requirements for equipment to prevent the discharge of oil from <br /> non-transportation-related onshore and offshore facilities into or upon the <br /> navigable waters of the US or adjoining shorelines. <br /> 112.3(a)-(c) Requirements for preparation and implementation of SPCC Plans in 1.0 <br /> accordance with 40 CFR 112.7 and any other applicable section of 40 <br /> CFR 112. <br /> 112.3(d) Obtain Professional Engineer's review and certification.P.E.Certifies the 1.4 <br /> SPCC Plan was prepared in accordance with good engineering practice, <br /> including consideration of applicable industry standards,and with the <br /> requirements of the SPCC rule. <br /> 112.3(e) Maintain copy of SPCC Plan on-site if facility is normally attended at least 1.1 <br /> 4 hours per day;otherwise,maintain it at nearest field office.Also,make <br /> Plan available to USEPA RA or other local agency inspector for on-site <br /> review during normal working hours. <br /> 112.4(a)-(c) When discharge>1,000 gallons of oil in a single discharge as described in 5.3.2 <br /> 40 CFR 112.1(b),or(2)discharge more than 42 U.S.gallons of oil as <br /> described in 40 CFR 112.1(b),in each of two discharges within any 12- <br /> month period,submit,within 60 days,a report to regional EPA and to the <br /> state agency in charge of oil pollution control activities,State Water <br /> Board. <br /> 112.4(d)&(e) If requested by the USEPA RA,respond to request for an amendment 5.3.2 <br /> within 30 days of the first notice and amend SPCC Plan within 30 days of <br /> USEPA's notification following facility's response. <br /> 112.5(a) Amend SPCC Plan,within 6 months,whenever there is change in facility 1.3 <br /> design,construction,operation or maintenance,which materially affects <br /> facility's potential for discharge. <br /> 112.5(b) Perform a review and evaluation of SPCC Plan at least once every five 1.3 <br /> years.The owner/operator must document completion of the review and <br /> evaluation,and must sign a statement as to whether he will amend the <br /> SPCC Plan.The following will suffice:"I have completed review and <br /> evaluation of the SPCC Plan for(name of facility)on(date),and will(will <br /> not)amend the Plan as a result." <br /> 112.5(c) Obtain Professional Engineer's certification for any technical amendments 1.3 <br /> in accordance with 112.3(d). <br />