My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
2800 - Aboveground Petroleum Storage Program
>
PR0515652
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 10:57:16 AM
Creation date
7/31/2019 1:22:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515652
PE
2832
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPCC PLAN REGULATORY CROSS-REFERENCE TABLE <br /> Section in <br /> 40 CFR this SPCC <br /> Section Description Plan <br /> §112.7 General Requirements for Spill Prevention,Control,and Countermeasure Plans <br /> 112.7 If you are the owner or operator of a facility subject to this part you must 1.4 <br /> prepare a Plan in accordance with good engineering practices.The Plan <br /> must have the full approval of management at a level of authority to <br /> commit the necessary resources to fully implement the Plan.You must <br /> prepare the Plan in writing. <br /> 112.7 If you do not follow the sequence specified in this section for the Plan,you Appendix 2 <br /> must prepare an equivalent Plan acceptable to the Regional Administrator (This <br /> that meets all of the applicable requirements listed in this part,and you checklist) <br /> must supplement it with a section cross-referencing the location of <br /> requirements listed in this part and the equivalent requirements in the <br /> other prevention plan. If the Plan calls for additional facilities or <br /> procedures,methods,or equipment not yet fully operational,you must <br /> discuss these items in separate paragraphs,and must explain separately <br /> the details of installation and operational start-up.As detailed elsewhere <br /> in this section,you must also: <br /> 112.7(a)(1) Include a discussion of your facility's conformance with the requirements Entire Plan <br /> listed in 40 CFR 112.7. <br /> 112.7(a)(2) Comply with all applicable requirements listed in this part.Your Plan may Entire Plan <br /> deviate from the requirements in paragraphs(g),(h)(2)and(3),and(i)of <br /> this section and the requirements in subparts B and C of this part,except <br /> the secondary containment requirements in paragraphs(c)and(h)(1)of <br /> this section,and§§112.8(c)(2),112.8(c)(11),112.9(c)(2), 112.10(c), <br /> 112.12(c)(2), 112.12(c)(11),112.13(c)(2),and 112.14(c),where applicable <br /> to a specific facility,if you provide equivalent environmental protection by <br /> some other means of spill prevention,control,or countermeasure.Where <br /> your Plan does not conform to the applicable requirements in paragraphs <br /> (g),(h)(2)and(3),and(i)of this section,or the requirements of subparts <br /> B and C of this part,except the secondary containment requirements in <br /> paragraphs(c)and(h)(1)of this section,and§§112.8(c)(2),112.8(c)(11), <br /> 112.9(c)(2), 112.10(c), 112.12(c)(2),112.12(c)(11),112.13(c)(2),and <br /> 112.14(c),you must state the reasons for nonconformance in your Plan <br /> and describe in detail alternate methods and how you will achieve <br /> equivalent environmental protection.If the Regional Administrator <br /> determines that the measures described in your Plan do not provide <br /> equivalent environmental protection,he may require that you amend your <br /> Plan,following the procedures in§112.4(d)and(e). <br />
The URL can be used to link to this page
Your browser does not support the video tag.