Laserfiche WebLink
Tracy Material Recovery& Transfer Station SPCC Plan <br /> Table 3-1 <br /> Locations with Spill Potential <br /> Location of Volume and Predicted <br /> Potential Releases Predicte <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> up to 12 gallons could be released <br /> before response could be initiated by on- <br /> site personnel. (Pumps are rated at 4-6 <br /> gpm and response time is estimated at 2 <br /> minutes). <br /> The AST located in Assuming a rupture of the AST results in A tank leak would be contained <br /> the pump house the loss of the entire contents, a total within the secondary containment <br /> (105-gal diesel) volume of 105 gallons would be released. space between the internal an <br /> <br /> ely ten gallons located inside pump building with <br /> <br /> m hose residues <br /> before supplier and/or facility personnel area possessing in excess of five <br /> hundred gallons capacity. <br /> would respond since someone is always <br /> present during filling. <br /> The closest storm drain is outside <br /> of the pump house and <br /> approximately 80 feet south of <br /> the pump house door. In the <br /> event of a release from the <br /> secondary containment, all <br /> contents of the AST would be <br /> contained with the pump building. <br /> October 2019 3-3 <br />