Laserfiche WebLink
Tracy Material Recovery& Transfer Station SPCC Plan <br /> Table 3-1 <br /> Locations with Spill Potential <br /> Location of Volume and Predicted <br /> Potential Releases Predicte <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> low to the north <br /> Assuming a rupture of the AST results in towards multiple inlets for the <br /> the loss of the entire contents, a total drain system and to the retention <br /> volume of 1,500 gallons would be basin. <br /> <br /> urs from small A piping leak would be contained <br /> shop diameter oil piping between the product within the bay by the shop floor <br /> tanks and the truck bay, up to 5 gallons slab and by sorbent deployed in <br /> might be released before response could response to the leak. <br /> be initiated by on-site personnel. <br /> October 2019 3-4 <br />