My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1250
>
2900 - Site Mitigation Program
>
PR0521881
>
WORK PLANS CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 12:41:22 PM
Creation date
8/5/2019 10:55:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0521881
PE
2960
FACILITY_ID
FA0014865
FACILITY_NAME
CALIFORNIA NATURAL PRODUCTS
STREET_NUMBER
1250
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19804001
CURRENT_STATUS
01
SITE_LOCATION
1250 E LATHROP RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k` ■KLEINFELDER <br /> 4 ANTICIPATED SCHEDULE <br /> The scope of work described in this workplan will be conducted in accordance with the <br /> following approximate schedule. <br /> —Anticipated Schedule Task <br /> Week 0 Submittal of workplan to RWQCB <br /> Week 0-2* RWQCB review and comment on workplan* <br /> Week 2-4* Revisions if needed and RWQCB approval of workplan* <br /> Week 4-6** Permitting and subcontractor schedulin ** <br /> Week 6-7 Monitoring well installation and development <br /> Week 8 Monitoring well sampling <br /> Week 8-10** Laboratory analysis** <br /> Week 10-12 Report preparation and submittal to California Natural Products <br /> Week 14 Submittal of groundwater monitoring well installation report to <br /> RWQCB by California Natural Products <br /> * Kleinfelder has no control over the time required by a regulatory agency to review and approve a workplan and <br /> permit applications. <br /> **Kleinfelder has no control over the time required or time frame that subcontractors place on the outlined tasks. <br /> 20-4587-02.WP2/2002R489 Page 9 of 12 <br /> Copyright 2002,Kleinfelder,Inc. June 6,2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.