My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1250
>
2900 - Site Mitigation Program
>
PR0521881
>
WORK PLANS CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 12:41:22 PM
Creation date
8/5/2019 10:55:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0521881
PE
2960
FACILITY_ID
FA0014865
FACILITY_NAME
CALIFORNIA NATURAL PRODUCTS
STREET_NUMBER
1250
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19804001
CURRENT_STATUS
01
SITE_LOCATION
1250 E LATHROP RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
hn K L E I N F E L D E R <br /> 3.6 INITIAL REPORTING <br /> Upon completion of the installation of the monitoring wells and receipt of the analytical results, <br /> a report of findings for the sampling will be prepared for client and agency review. The report <br /> will include: <br /> • A description of field activities, observations, and protocols. <br /> • Field logs for each well documenting depth to groundwater, parameters <br /> measured before, during, and after purging, method of purging, calculation of <br /> the casing volume, and total volume of water purged. <br /> • Calculation of groundwater elevations, and assessment of the groundwater flow <br /> direction and gradient on the date of the measurement, comparison to previous <br /> flow direction and gradient data, and discussion of seasonal trends, if any. <br /> A scaled map showing relevant structures and features of the facility, the <br /> locations of the monitoring wells. <br /> • Results of the sample analysis with copies of certified analytical laboratory <br /> results with chain-of-custody documentation; <br /> • Description and documentation of QA/QC procedures employed for field and <br /> laboratory work; and <br /> • An assessment of the results with conclusions and recommendations. <br /> 3.7 ONGOING QUARTERLY MONITORING <br /> Quarterly monitoring of the 2 new groundwater monitoring wells installed in this workplan will <br /> be conducted in accordance with and incorporated into the quarterly schedule of monitoring. <br /> The monitoring wells will be sampled in accordance with the Monitoring and Reporting <br /> Program (M&RP) from the RWQCB, and Meinfelder's Sampling and Analysis Plan dated <br /> April 13, 2001. <br /> 20-4587-02.WP2/2002R489 Page 8 of 12 <br /> Copyright 2002,Kleinfelder,Inc. June 6,2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.