My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2010 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 3:37:10 PM
Creation date
8/5/2019 11:56:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2014
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This procedure assumes you are changing the EEPROM (E2) chip, but not the ECPU board. <br />1. Switch Off power to the console. Open the left front door of the console and locate the ECPU board <br />[reference Figure 1 on page 61. <br />2. Remove the ECPU board following the instructions in "Removing the ECPU Board" on page 5 with one <br />exception - DO NOT turn the Battery Backup switch OFF as instructed in that procedure. <br />A <br />3. Locate the E2 chip on your ECPU board (see Figure 2 on page 7 or Figure 3 on page 8). <br />4. Remove the E2 chip following the instructions shown in Figure 4 on page 9. <br />5. Replace the E2 chip following the instructions shown in Figure 5 on page 9. <br />6. Replace the ECPU board following the instructions shown in Figure 6 on page 10 with one exception - you <br />can ignore step 4 in Figure 6 since you did not turn off battery backup when you removed the board. <br />7. Close the left front door of the console and restore AC power to the console. <br />The display will cycle through the following warm boot screens: <br />SYSTEM WARM START <br />SYSTEM SELF TEST <br />SYSTEM STARTUP COMPLETE <br />At this point front panel display reads: <br />MMM DD, YYYY HH:MM:SS XM <br />ALL FUNCTIONS NORMAL <br />8. You should archive the current system setup data in the blank E2 chip following instructions in "Record the <br />System Setup Into the EEPROM Chip" on page 4. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.